Case study:Revitalisation of branches ’Boros Dráva and Drávakeresztúri’
Jump to navigation
Jump to search
This case study is pending approval by a RiverWiki administrator.
Location: 17° 45' 49.68" N, 45° 48' 58.27" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | Hungary |
Main contact forename | |
Main contact surname | |
Main contact user ID | |
Contact organisation | South-Transdanubian Environment Protection and Water Management Directorate (DDKÖVÍZIG) |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Danube |
---|---|
River basin | Danube |
Subcatchment
River name | Drava |
---|---|
Area category | 1000 - 10000 km² |
Area (km2) | |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | |
Dominant geology | Siliceous |
Ecoregion | Alps |
Dominant land cover | Extensive agriculture, Grassland |
Waterbody ID |
Other case studies in this subcatchment: Kleblach-Side channel, Revitalisation of branch ’Felsőszentmártoni’ at River Dráva, Water and Life for Drava and Vuka
Site
Name | Drava-Danube area |
---|---|
WFD water body codes | AEP438 |
WFD (national) typology | 14 |
WFD water body name | |
Pre-project morphology | Oxbow detached by boulder weir from main flow |
Reference morphology | Sidearm |
Desired post project morphology | |
Heavily modified water body | false |
National/international site designation | |
Local/regional site designations | Area of Special Conservation Interest, Biosphere Reserve |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Artificially regulated, Permanent lentic |
Dominant substrate | Silt, Mud, Gravel |
River corridor land use | Intensive agriculture, Woodland |
Average bankfull channel width category | more than 50 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 5 - 10 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2010/02/01 |
Works started | 2010/05/01 |
Works completed | 2011/08/01 |
Project completed | |
Total cost category | 100 - 500 k€ |
Total cost (k€) | 300 k€300,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Hungary-Croatia IPA Cross-border Co-operation Programme |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | 100 - 500 k€ | 300 k€300,000 € <br /> | South-Transdanubian Environment Protection and Water Management Directorate | ||
Monitoring | South-Transdanubian Environment Protection and Water Management Directorate |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | Quantity & dynamics of flow, Substrate conditions |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|