Case study:Water and Life for Drava and Vuka
Jump to navigation
Jump to search
This case study is pending approval by a RiverWiki administrator.
Location: none specified
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | Hungary |
Main contact forename | Tibor |
Main contact surname | Parrag |
Main contact user ID | |
Contact organisation | Zajednica športsko ribolovnih društava, Osijek, Croatia |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Danube |
---|---|
River basin | Danube |
Subcatchment
River name | Drava |
---|---|
Area category | 1000 - 10000 km² |
Area (km2) | |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | |
Dominant geology | Siliceous |
Ecoregion | Alps |
Dominant land cover | Extensive agriculture, Grassland |
Waterbody ID |
Other case studies in this subcatchment: Kleblach-Side channel, Revitalisation of branch ’Felsőszentmártoni’ at River Dráva, Revitalisation of branches ’Boros Dráva and Drávakeresztúri’
Site
Name | Drava-Danube area |
---|---|
WFD water body codes | AEP438 |
WFD (national) typology | 14 |
WFD water body name | |
Pre-project morphology | Oxbow detached by boulder weir from main flow |
Reference morphology | Sidearm |
Desired post project morphology | |
Heavily modified water body | false |
National/international site designation | |
Local/regional site designations | Area of Special Conservation Interest, Biosphere Reserve |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Artificially regulated, Permanent lentic |
Dominant substrate | Silt, Mud, Gravel |
River corridor land use | Intensive agriculture, Woodland |
Average bankfull channel width category | more than 50 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 5 - 10 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2010/03/01 |
Works started | |
Works completed | 2013/03/01 |
Project completed | |
Total cost category | 1000 - 5000 k€ |
Total cost (k€) | 1323 k€1,323,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Hungary-Croatia IPA Cross-border Co-operation Programme |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | Duna-Dráva National Park Directorate | Tibor | Parrag | ||
Stakeholder engagement and communication | Duna-Dráva National Park Directorate | Tibor | Parrag | ||
Works and works supervision | Duna-Dráva National Park Directorate | Tibor | Parrag | ||
Post-project management and maintenance | Duna-Dráva National Park Directorate | Tibor | Parrag | ||
Monitoring | Duna-Dráva National Park Directorate | Tibor | Parrag |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Dredging of sediment (mud) |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | Reduction of boulder weir hight |
Non-structural measures
| |
Management interventions | Ensuring biodiversity |
Social measures (incl. engagement) | Recreation |
Other | Information provision, Consultation |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] | Awaiting results |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] | Awaiting results |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] | Awaiting results |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|