Case study:Rinya water-system reconstruction
Jump to navigation
Jump to search
This case study is pending approval by a RiverWiki administrator.
Location: The following coordinate was not recognized: 46.040201,17.349362,46.205366,17.453132,46.285195,17.448956.The following coordinate was not recognized: 46.040201,17.349362,46.205366,17.453132,46.285195,17.448956.
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity |
Country | Hungary |
Main contact forename | |
Main contact surname | |
Main contact user ID | |
Contact organisation | South-Transdanubian Environmental Protection and Water Management Directorate |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Danube |
---|---|
River basin | Drava |
Subcatchment
River name | Rinya |
---|---|
Area category | 100 - 1000 km² |
Area (km2) | 912 km²91,200 ha <br /> |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | |
Dominant geology | Calcareous |
Ecoregion | Hungarian Lowlands |
Dominant land cover | Intensive agriculture |
Waterbody ID |
Site
Name | Szabás |
---|---|
WFD water body codes | AEP288 |
WFD (national) typology | 9 |
WFD water body name | |
Pre-project morphology | Single channel, Deepening, Straight |
Reference morphology | Single channel, Sinuous, Pool-riffle |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | EU - Special Protected Area |
Local/regional site designations | National Park |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Permanent lotic |
Dominant substrate | Boulders, Sand |
River corridor land use | Intensive agriculture (arable), Woodland |
Average bankfull channel width category | 2 - 5 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | Less than 0.5 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | 5050 m³/s <br />50,000 l/s <br /> |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 37000 m37 km <br />3,700,000 cm <br /> |
---|---|
Project started | 2008/04/01 |
Works started | |
Works completed | 2011/12/01 |
Project completed | |
Total cost category | 1000 - 5000 k€ |
Total cost (k€) | 1856 k€1,856,000 € <br /> |
Benefit to cost ratio | |
Funding sources | European Union and the European Regional Development Fund |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | South-Transdanubian Environmental Protection and Water Management Directorate | ||||
Stakeholder engagement and communication | South-Transdanubian Environmental Protection and Water Management Directorate | ||||
Works and works supervision | South-Transdanubian Environmental Protection and Water Management Directorate | ||||
Post-project management and maintenance | South-Transdanubian Environmental Protection and Water Management Directorate | ||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Reduction of bank slope, Creation of new weirs, Reventment renewal, Creation of fish ladders, Riverbed stabilization |
Floodplain / River corridor | Riparian tree and bush planting, Reduction of alien plant species |
Planform / Channel pattern | Channel widening |
Other | |
Non-structural measures
| |
Management interventions | Ensuring biodiversity |
Social measures (incl. engagement) | Recreation, Decreased flood risk |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Quantity & dynamics of flow | Awaiting results | |||||
Continuity for organisms | Awaiting results |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish: Species composition | Awaiting results |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|