File:ShowHideAdditionalImage.png
Jump to navigation
Jump to search
ShowHideAdditionalImage.png (180 × 21 pixels, file size: 2 KB, MIME type: image/png)
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 03:29, 5 September 2013 | 180 × 21 (2 KB) | Admin (talk | contribs) |
You cannot overwrite this file.
File usage
More than 100 pages use this file. The following list shows the first 100 pages that use this file only. A full list is available.
- Case study:Aaijen- Removal of bank fixation
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos
- Case study:Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins
- Case study:Agreed definition of mobility area for the Adour
- Case study:Beneden-Leeuwen-Side channel
- Case study:Biodiversity conservation and recovery in the river basin Asón
- Case study:Biologisk återställning i Rolfsåns vattensystem
- Case study:Biomura LIFE06NAT/SI/000066
- Case study:Bleinheim Palace Project
- Case study:Boosting slivso
- Case study:Buenz
- Case study:Buiten Ooij
- Case study:Chiese river upstream Idro lake – Trentino region
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia )
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros
- Case study:Creation and restoration of a riparian zone
- Case study:Demolition of weir on the River Nora, Nalón Basin
- Case study:Dove Weir removal
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA
- Case study:Ems floodplain
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba)
- Case study:Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia)
- Case study:Fluvial improvement in Riera de Caldés
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain
- Case study:Fluvial restoration in River Carrión
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development
- Case study:HPP Blanca
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage.
- Case study:Inchewan Burn Bed restoration
- Case study:Isar-Plan
- Case study:Kleblach-Side channel
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica
- Case study:Ladywell Fields (QUERCUS)
- Case study:Langford Lakes project
- Case study:Langonnet river
- Case study:Lek Bij Everdingen
- Case study:Lippeaue Klostermersch
- Case study:Marsh restoration on the Merlue
- Case study:Meades water garden regeneration project
- Case study:Meers - Floodplain lowering
- Case study:Millingerwaard-Floodplain rehabilitation
- Case study:Morava restoration project
- Case study:Nar SSSI project
- Case study:Natura 2000conservation in Alta Tuscia Viterbese LIFE04 NAT/IT/000153
- Case study:New Forest LIFE project
- Case study:Opijnen- Side channel
- Case study:PROGETTO WETLAND - Volturno
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM
- Case study:RESTORATION OF THE TRESENEC STREAM
- Case study:RSPB Fowlmere Nature Reserve
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu
- Case study:Recovery "CañoTravieso"
- Case study:Recovery of the functionality of Brazo de la Torre
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream
- Case study:Recreation of a sinuous low-flow channel in the Merloz
- Case study:Refilling the meanders of the Colostre
- Case study:Regelsbrunner Aue
- Case study:Removal of Maisons-Rouges dam over the River Vienne
- Case study:Removal of five Lakes on the Val des Choues stream
- Case study:Removal of the Kernansquillec dam over the River Léguer
- Case study:Removal of the pont Paillard weir on a secondary arm of the Aume
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon
- Case study:Renaturierung Untere Havel
- Case study:Reopening of a section of the River Bièvre in an urban environment
- Case study:Reppisch
- Case study:Restoration in river Tajo and tributaries after kaolin spillage
- Case study:Restoration of Myllypuro brook
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes
- Case study:Restoration of the Charentonne in the Serquigny public garden
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries
- Case study:Restoration of the marsh "Gallega"
- Case study:Restoration of the previous riverbed of the Dadon
- Case study:Restoration of the stream of the Partido
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge
- Case study:Restoring the River Doquette to its original bed
- Case study:Rijkelse Bemden - River bed widening
- Case study:Ritobäcken-environmentally preferable two-stage drainage channels
- Case study:River Avon at East Chisenbury
- Case study:River Calder improvement project
- Case study:River Cole- Life Project
- Case study:River Dee
- Case study:River Glaven conservation group
- Case study:River Kennet Restoration at Durnsford
- Case study:River Quaggy- Chinbrook meadows
- Case study:River Roding at Ray Lodge Park
- Case study:River Skerne- Life project
- Case study:River Wensum Rehabilitation Project - Bintree
- Case study:Route water: environmental restoration project for tourist use
- Case study:SCI Parga-Ladra-Támoga: recovery of bog woodland and dystrophic lake
- Case study:Silverån övre
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort
- Case study:South Esk restoration
- Case study:Stora, Holstebro HEP station
- Case study:Thur
- Case study:Timber float restorations at River Iijoki
- Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572
- Case study:Valtellina 2005 – New green system
- Case study:Vester Nebel Restoration
- Case study:Vindel River LIFE
- Case study:Vreugderijkerwaard side channel
View more links to this file.