Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3

From RESTORE
Revision as of 06:57, 25 July 2013 by Marinela (talk | contribs)
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 44° 57' 38.41" N, 29° 27' 53.34" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity
Country Romania
Main contact forename Eugenia
Main contact surname Cioaca
Main contact user ID
Contact organisation Danube Delta National Institute for Research and Development, Tulcea
Contact organisation web site http://www.ddni.ro
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district Danube
River basin Danube

Subcatchment

River name Sf. Gheorghe Branch
Area category more than 10000 km²
Area (km2)
Maximum altitude category Less than 100 m
Maximum altitude (m) 0.5 m5.0e-4 km <br />50 cm <br />
Dominant geology Organic (i.e. Peat)
Ecoregion Pontic Province
Dominant land cover Wetland
Waterbody ID



Other case studies in this subcatchment: Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1, Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2, The Holbina-Dunavat Restoration Project


Site

Edit site
Name Ivancea Island
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Closed culvert
Reference morphology Groundwater dominated
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations World Hertiage Site
Protected species present
Invasive species present
Species of interest
Dominant hydrology Artificially regulated
Dominant substrate Clay
River corridor land use Wetland
Average bankfull channel width category 5 - 10 m
Average bankfull channel width (m) 1010 m <br />0.01 km <br />1,000 cm <br />
Average bankfull channel depth category 0.5 - 2 m
Average bankfull channel depth (m) 2 m0.002 km <br />200 cm <br />
Mean discharge category
Mean annual discharge (m3/s) 22 m³/s <br />2,000 l/s <br />
Average channel gradient category
Average channel gradient 0.015
Average unit stream power (W/m2) 29.42129.421 W/m² <br />


Project background

Edit project background
Reach length directly affected (m) 810 m0.81 km <br />81,000 cm <br />
Project started 2006/01/01
Works started 2007/08/01
Works completed 2007/10/01
Project completed
Total cost category 100 - 500 k€
Total cost (k€)
Benefit to cost ratio
Funding sources Environment Ministry, Environment and Water Management Ministry

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design 50 - 100 k€ Danube Delta National Institute Dan David
Stakeholder engagement and communication Tulcea Forestry Administration Radu Vasile
Works and works supervision Danube Delta National Institute Dan David
Post-project management and maintenance Tulcea Forestry Administration Radu Vasile
Monitoring 100 - 500 k€ 300 k€300,000 € <br /> Danube Delta National Institute, Tulcea Eugenia Cioaca



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology Quantity & dynamics of flow
Biology Fish: Disturbance-sensitive species
Physico-chemical Nutrient concentrations
Other reasons for the project Community demand


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern Canals to improve the hydrologic regime
Other
Non-structural measures
Management interventions
Social measures (incl. engagement) Improved public access
Other Information provision


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Quantity & dynamics of flow Improvement

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish: Species composition Improvement

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Nutrient concentrations Yes Improvement

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Public awareness of fish catching Improvement


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description
http://www.ddni.ro The site of the Danube Delta National Institute for Research and Development (DDNIRD)

Supplementary Information

Edit Supplementary Information