Case study:Restoration of Rusenski Lom River near Ivanovo
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Hydromorphology |
Country | Bulgaria |
Main contact forename | Ivan |
Main contact surname | Hristov |
Main contact user ID | |
Contact organisation | WWF Danube Carpathian programme Bulgaria |
Contact organisation web site | http://www.wwf.bg |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The project was implemented in 2009 by the Russenski Lom Nature Park Directorate, Club „Friends of Russenski Lom” and WWF with the support of the Ministry of Culture and was funded by WWF and the German Federal Ecological Foundation DBU
The main issues are the following:
•In the mid 20th century most of the lower flow of Russenski Lom River was fully diverted;•High water floods the road;•When water overflows the dike it can no longer go back into the river;•The flood in 2006 washed away the bridge and the alcoves on the island once again;•In this case, the water itself suggested the solution to the problem;•It is the first example in Bulgaria for application of the principle “more space for the river – more safety for people”, proven yet in mid 20th century.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Danube |
---|---|
River basin | Rusenski Lom River |
Subcatchment
River name | Rusenski Lom |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | Less than 100 m |
Maximum altitude (m) | |
Dominant geology | Calcareous |
Ecoregion | Pontic Province |
Dominant land cover | Intensive agriculture (arable) |
Waterbody ID |
Site
Name | Protected area "Lomovete" |
---|---|
WFD water body codes | BG1RL120R013 |
WFD (national) typology | BGTR2 |
WFD water body name | |
Pre-project morphology | Embanked |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | EU - Special Protected Area |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Artificially regulated |
Dominant substrate | Sand |
River corridor land use | Intensive agriculture (arable) |
Average bankfull channel width category | more than 50 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 2 - 5 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2008/03/01 |
Works started | 2008/09/01 |
Works completed | 2009/03/01 |
Project completed | |
Total cost category | 10 - 50 k€ |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | WWF Germany, DBU |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | 1 - 10 k€ | ||||
Stakeholder engagement and communication | 1 - 10 k€ | ||||
Works and works supervision | 1 - 10 k€ | ||||
Post-project management and maintenance | Less than 1 k€ | ||||
Monitoring | Less than 1 k€ |
Reasons for river restoration
Mitigation of a pressure | Flood risk management, Flood defence |
---|---|
Hydromorphology | Width & depth variation |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Structure & condition of riparian/ lake shore zones | Inconclusive |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish: Species composition | Inconclusive |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|---|
http://www.wwf.bg/ | WWF-Bulgaria |
http://lomea.org/ | Directorate "National park Rusenski Lom" |