Case study:The Holbina-Dunavat Restoration Project
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Romania |
Main contact forename | Marian |
Main contact surname | Tudor |
Main contact user ID | |
Contact organisation | The Danube Delta Biosphere Reserve Authority |
Contact organisation web site | http://www.ddbra.ro |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Holbina-Dunavat area (S=5630 ha) has been studied from 1994 in order to establish a strategy for ecological restoration by a reintegration of the fish farm basins with the surrounding wetlands by opening the ring dikes around the basins. The positive effects are both ecological (wetland restoration, natural habitat and breeding area for fish and aquatic birds) and socio-economical (development of traditional activities, fishing, livestock and reed harvesting, creation of recreational areas for ecotourism) for the local people.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Danube |
---|---|
River basin | Danube |
Subcatchment
River name | Sf. Gheorghe Branch |
---|---|
Area category | more than 10000 km² |
Area (km2) | |
Maximum altitude category | Less than 100 m |
Maximum altitude (m) | 0.5 m5.0e-4 km <br />50 cm <br /> |
Dominant geology | Organic (i.e. Peat) |
Ecoregion | Pontic Province |
Dominant land cover | Wetland |
Waterbody ID |
Other case studies in this subcatchment: Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1, Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2, Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3
Site
Name | Fishpond Holbina-Dunavat |
---|---|
WFD water body codes | RORW14.1_B7 |
WFD (national) typology | RO15 |
WFD water body name | |
Pre-project morphology | Sinuous, Fish ponds, Artificial channel |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | International - RAMSAR site |
Local/regional site designations | Biosphere Reserves |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | Artificially regulated, Floodplain area |
Dominant substrate | Peat, Sand |
River corridor land use | Wetland |
Average bankfull channel width category | 10 - 50 m |
Average bankfull channel width (m) | 1212 m <br />0.012 km <br />1,200 cm <br /> |
Average bankfull channel depth category | 0.5 - 2 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | 150150 m³/s <br />150,000 l/s <br /> |
Average channel gradient category | |
Average channel gradient | 0.015 |
Average unit stream power (W/m2) | 1838.81251,838.813 W/m² <br /> |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 1993/01/01 |
Works started | 2003/01/01 |
Works completed | 2004/01/01 |
Project completed | |
Total cost category | more than 10000 k€ |
Total cost (k€) | 2000000 k€2,000,000,000 € <br /> |
Benefit to cost ratio | |
Funding sources | MAPM-ARBDD, National budget, 2000000 |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | more than 10000 k€ | 130000 k€130,000,000 € <br /> | The Danube Delta National Institute for Research and Development, Tulcea | Marian | Tudor |
Stakeholder engagement and communication | The Danube Delta Biosphere Reserve Authority, Tulcea | Marian | Tudor | ||
Works and works supervision | |||||
Post-project management and maintenance | The Danube Delta Biosphere reserve | ||||
Monitoring | The Danube Delta National Institute for Research and Development, Tulcea (office@indd.tim.ro) | Marian | Tudor |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Create breaches in the bank |
Floodplain / River corridor | Creation of wetlands |
Planform / Channel pattern | Connecting Fishpond Holbina-Dunavat to the Danube regime |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Quantity & dynamics of flow | Improvement | |||||
Continuity of sediment transport |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish | Improvement | |||||
Invertebrates | ||||||
Macrophytes | ||||||
Phytoplankton | ||||||
Zooplancton |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Nutrient concentrations | Improvement | |||||
Salinity | ||||||
pH | ||||||
Oxygen balance | ||||||
Temperature |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
fish resources | Improvement |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|