Case study:River Ogwen and Nant Francon
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Flood risk management, Land use management - agriculture |
Country | Wales |
Main contact forename | Hugh |
Main contact surname | Jones |
Main contact user ID | |
Contact organisation | Natural Resources Wales |
Contact organisation web site | http://naturalresourceswales.gov.uk/ |
Partner organisations | National Trust, Environment Agency |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Ogwen is in a mountainous location of Snowdonia below Llyn Ogwen (Lake Ogwen), and flows northwards through the Nant Ffrancon valley.
During the 1960s the river was deepened by dredging over a 4km length downstream of the waterfall in an attempt to reduce the frequency of flooding over the valley floor to improve livestock grazing. Over the following 30 years the river flushed virtually all bed gravels through the system and scoured the river bed and banks. The reach became severely denuded of any stable habitat for flora and fauna, the once thriving salmon fishery declined and flooding was still troublesome to farmers.
Four boulder cascades were created and pool and riffle sequences created in the upper reach. Some runs of gravel were introduced and shoals were created on the inside of bends. A major erosion site was reinstated using a willow mattress technique.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | River Ogwen |
---|---|
WFD water body codes | GB110065054160 |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Over deepened |
Reference morphology | Pool-riffle |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | Salmonids |
Dominant hydrology | |
Dominant substrate | Gravel |
River corridor land use | Agricultural (Livestock) |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 900900 m <br />0.9 km <br />90,000 cm <br /> |
---|---|
Project started | 1998/09/01 |
Works started | |
Works completed | 1998/11/30 |
Project completed | |
Total cost category | 50 - 100 k€ |
Total cost (k€) | 5656 k€ <br />56,000 € <br /> |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Supplementary funding information
Of the £48,000 (€56,000) project cost- £8,000 (€9,300) was spent on a flood model and £5,000 (€5,800) was spent on design.
Reasons for river restoration
Mitigation of a pressure | Flood risk management |
---|---|
Hydromorphology | Channel pattern/planform, sediment transport |
Biology | Fish |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Installation of cascades, Creation of pools and riffles |
Floodplain / River corridor | |
Planform / Channel pattern | Morphology of the bed altered |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish | Yes | Yes | Yes | Yes | No | Improvement |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|---|
http://www.therrc.co.uk/pdf/manual/MAN 5 3.pdf | Manual of River Restoration Techniques entry (RRC) |
http://www.therrc.co.uk/pdf/manual/MAN 8 4.pdf | Manual of River Restoration Techniques entry (RRC) |
Supplementary Information
Edit Supplementary Information