Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | http://www.ddkovizig.hu/tartalom/revitalisation_of_branch_felsoszentmartoni_at_river_drava/311 |
Themes | Habitat and biodiversity |
Country | Hungary |
Main contact forename | Alajos |
Main contact surname | Burián |
Main contact user ID | |
Contact organisation | South-Transdanubian Water Management Directorate - titkarsag@ddvizig.hu |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project |
Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva |
This is a parent project encompassing the following projects |
No |
Project summary
The ‘Felsőszentmártoni’ branch, situated in the region of ‘Felsőszentmárton’ settlement, is one of the left-side branches of River Dráva, which has completely cut-off from the main river by now and silted up significantly. The interventions done are the removal of overgrown salicaceae from the riverbed, the removal of silt along the whole length of the branch and it's deposition into the main channel of River Dráva. The reconstruction of the weir that now prevents proper water flow and thus water replenishment of the branch.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Danube |
---|---|
River basin | Danube |
Subcatchment
River name | Drava |
---|---|
Area category | 1000 - 10000 km² |
Area (km2) | |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | |
Dominant geology | Siliceous |
Ecoregion | Alps |
Dominant land cover | Extensive agriculture, Grassland |
Waterbody ID |
Other case studies in this subcatchment: Kleblach-Side channel, Revitalisation of branches ’Boros Dráva and Drávakeresztúri’, Water and Life for Drava and Vuka
Site
Name | Felsőszentmárton |
---|---|
WFD water body codes | AEP438 |
WFD (national) typology | 14 |
WFD water body name | |
Pre-project morphology | Artifical oxbow completely cut-off from the main river, Silted up significantly |
Reference morphology | Sidearm |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | EU - Special Area of Conservation |
Local/regional site designations | National Park, UNESCO Biosphere Reserve, Natura 2000 |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Permanent lentic |
Dominant substrate | Gravel, Silt |
River corridor land use | Woodland, Intensive agriculture |
Average bankfull channel width category | more than 50 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 5 - 10 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | 502502 m³/s <br />502,000 l/s <br /> |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 1500 m1.5 km <br />150,000 cm <br /> |
---|---|
Project started | 2010/11/01 |
Works started | 2011/03/01 |
Works completed | 2012/10/01 |
Project completed | |
Total cost category | 500 - 1000 k€ |
Total cost (k€) | 596 k€596,000 € <br /> |
Benefit to cost ratio | |
Funding sources | European Union and co-financed by the European Regional Development Fund |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | South Transdanubian Regional Development Council and Agency | ddrft@ddrft.hu | |||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Dredging: removal of 47, 735 m3 alluvium, Reconstruction of the current weir - height reduction, Pipeline laid in the lower parts of the weir |
Floodplain / River corridor | Removal of the overgrown salicaceae trees |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | Ensuring biodiversity |
Social measures (incl. engagement) | Recreation |
Other | Consultation, Information provision |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Quantity & dynamics of flow | Yes | Yes | Improvement | |||
Continuity for organisms | Yes | Yes | Improvement | |||
Substrate conditions | Yes | Yes | Improvement |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish: Species composition | Yes | Yes | Yes | Yes | Awaiting results | |
Fish: Age structure | Yes | Yes | Yes | Awaiting results |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|