Case study:Restoration of the Roer for species migration

From RESTORE
Revision as of 15:27, 27 June 2013 by LauraRRC (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 6' 37.51" N, 5° 59' 15.18" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.vismigratieroer.nl
Themes Fisheries, Habitat and biodiversity
Country Netherlands
Main contact forename Peter
Main contact surname Brouwers
Main contact user ID
Contact organisation Waterschap Roer en Overmaas
Contact organisation web site http://www.overmaas.nl
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The Roer river forms a potential habitat for fish species that migrate between the Meuse and the Roer. The Dutch section of the Roer also forms a route for fish that migrate between the North Sea and the Meuse to their spawning.

The main aim of the project was to facilitate improved habitat access and migratory conditions in the Roer Delta for Atlantic salmon (Salmo salar) and other Annex II species, namely asp (Aspius aspius), bullhead (Cottus gobio), river lamprey (Lampetra fluviatilis), brook lamprey (Lampetra planeri), sea lamprey (Petromyzon marinus), bitterling (Rhodeus sericeus susbsp. amarus)and weatherfish (Misgurnis fossilis).

A new fish ladder was built in Roermond and the existing fish ladder at Hambeek was improved to increase its effectiveness. These two structures overcome the last remaining obstacles for fish migration between the river Meuse and the Dutch part of the river Roer, thus opening up an improved migratory route for fish from the North Sea to Germany.

Monitoring has confirmed that three of the species targeted by the project (salmon, sea lamprey and European bullhead are using the new Roermond fish ladder. Salmon and sea lamprey have also been recorded using the improved Hambeek migratory facilities and ongoing monitoring by the beneficiary will continue to measure the project’s long term impact on fish populations in the Roer.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment



Site

Edit site
Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations Natura 2000
Protected species present Yes
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information