Case study:River Ebbw Bank Stabilisation

From RESTORE
Revision as of 12:21, 18 May 2013 by Ascarr (talk | contribs)
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 39' 18.52" N, 3° 8' 5.89" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://salixrw.com/project/river-ebbw-bank-stabilisation
Themes
Country Wales
Main contact forename David
Main contact surname Holland
Main contact user ID
Contact organisation Salix River & Wetland Services Limited
Contact organisation web site http://www.salixrw.com
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Following restoration

Project summary

Edit project overview to modify the project summary.


This project aimed to stabilise a highly erodible bank consisting mainly of colliery shale by using a green, visually appealing method. Rock rolls and live willow bundles (faggots) were placed to protect toes. The upper bank was protected using high performance erosion control mats and native willow cutting. Locally occurring riverside grasses and rushes were planted to revegetate the marginal areas.

The River Restoration Centre would like to thank David Holland from Salix River & Wetland Services Limited for providing the information and photographs for this case study.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Subcatchment:Severn


Site

Edit site
Name River Ebbw
WFD water body codes GB109056026910
WFD (national) typology Mid, Medium, Siliceous
WFD water body name Ebbw R - conf Ebbw Fach R to Maes-glas
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category 10 - 100 m³/s
Mean annual discharge (m3/s) 8080 m³/s <br />80,000 l/s <br />
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2) 4.2 4.2 W/m² <br />


Project background

Edit project background
Reach length directly affected (m) 800800 m <br />0.8 km <br />80,000 cm <br />
Project started 2005/01/02
Works started
Works completed
Project completed 2005/04/03
Total cost category 10 - 50 k€
Total cost (k€) 1515 k€ <br />15,000 € <br />
Benefit to cost ratio
Funding sources Merrimans Ltd

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications Bank stabilization and erosion protection
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]] No No No No No

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery


River ebbw 001.jpg
River ebbw 003.jpg
River ebbw 005.jpg
Greening new literature.JPG
Ebbw June 2005 004.jpg
Green new literature.JPG
DSC05492.JPG
DSC05497.JPG
DSC05500.JPG


Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description
http://salixrw.com/files/salixrw/case-studies/River%20Ebbw%20.pdf Salix Case study:River Ebbw Bank Stabilisation

Supplementary Information

Edit Supplementary Information