Property:Other technical measure
Jump to navigation
Jump to search
This is a property of type String.
D
W
R
B
Fish by-pass channel +
T
I
Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. +
Fish habitat restoration +
L
Fish habitat restoration +
T
Fish habitat restoration +
O
Fish habitat restoration +
P
Fish stocking +
E
General cleaning of the area +, removal of rubble and rubbish; Reforestation of the Park with local plant species (and equipped with an irrigation network); improve existing roads and paths (3.65 km) and new pedestrian paths were planned (3.65 km); Urban furniture; Construction of a small building located in a point of maximum elevation that allows the observation of the environment +
H
W
Hardened crossing points +
D
I
B
Improve the river for mussels to survive +
F
Improvement of local paths and river banks +
T
Improvement of natural flows +