Property:Picture description
Jump to navigation
Jump to search
This is a property of type String.
U
Upper Cringle Brook Before and After Collagee +
Upper Usk +
V
VALAGUA (Valorização ambiental e gestão integrada da água e dos habitats no Baixo Guadiana transfronteiriço) +
Valagua project +
Valley Brook Crewe +
B
Valuable topsoil and nutrients entering the Ladden Brook from agricultural run-off +
R
Vasselina River area +
G
Vegetated berm and woody debris creating flow and habitat diversity within link channel – August 2013. Photo credit RRC +
M
B
View of completed works, 18th Feb 2016 +
A
View of newly created watercourse +
W
View of one of the LWD structures installed as part of the Woodsford Channel Project +
L
View of reedbed showing baffles jutting into pool +
R
View of the project area. Stržen's riverbed (straight channel and former meanders) is visible in the top half of the photo. +
K
View of the river from the tree platform +
B
View towards Bastion Maria, Spring 2007 +
C
Vistula River Natural Stretch. (Katarzyna Suska SSIFI). +
R
Volunteer Photographing river Brent at Quainton Street Open Space +
P
Volunteer-led in-channel works in progress +
R
Volunteers adding Siltex to Carshalton Ponds in November 2014. Please seek permission from the Wandle Trust to reuse this photograph. +
Z
WFD water bodies in the Hunze en Aa's water authority region. The Zeegserloopje is part of the Drentse Aa water body. +