Property:River corridor measure

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
D
Buffer strips  +, Floodplain reconnection  +
G
Fencing  +, Livestock fencing  +, Buffer strips  +,
C
Introducing large woody debris  +, Floodplain reconnection  +, Floodplain creation  +,
M
Built new sea defences inland then breached original shingle bank  +, Habitat enhancement  +, Drainage ditches  +,
L
Bund removal  +, Creation of wetland  +
U
Channel realignment  +, channel reprofiling  +, reinstatement of three wetlands  +
B
Channel realignment  +, Conservation measures and environmental improvement  +, Creation of multi stage channel  +,
Water release into floodplain in winter  +, Closing of sluice in summer  +, Future floodplain lowering  +
R
Complete conversion to a natural layout of the riparian strip of the Ninfa River; completion of the planting of plants  +, Creation of structures to attract wildlife  +
I
V
Removal of exotic plants  +, Conditioning access to properties and pedestrian paths  +, Habitat creation  +
R
Connection to wider floodplain  +, Creation of wetland  +
Connection to wider floodplain  +
Connection to wider floodplain  +
L
Floodplain reconnection  +, Tree planting  +, Connection to wider floodplain  +
R
Creation of wetland  +, Connection to wider floodplain  +
E
Connection to wider floodplain  +, Floodplain creation  +
U
Increase water retention area  +, Connection to wider floodplain  +, Wetland habitat  +
T
Connection to wider floodplain  +
F
Increase water retention area  +, Connection to wider floodplain  +, Wetland habitat  +