Property:Picture description

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
R
Site Location Plan  +
L
Site locations (North West Kent Countryside Partnership)  +
R
Site plan for the restored reach  +
G
Snapshots of the interactive map.  +
T
Soil husbandry workshops in the Pow Beck catchment  +
V
Source of photographs - ECRR 2008. Upper row (left and right): original reach of the Voorste Nete. Middle row (left and right): Excavation of a 5 m wide stretch for placing the bentonite mat and refilling with the original sand. Bottom row (left and right): Diverted reach of the Voorste Nete, dug out in sand filled bentonite lining with transferred substrate from the original reach, and the same stretch 6 months later during first monitoring showing the changes in dimensions caused by a summer storm in 2004.  +
R
A
Stabilization work commences  +
I
Stages of the Inturia dam Removal. The image shows the comparison with the initial state and the results of the first two stages of the project and also the reduced height in each year. Photo credits: Irekia.  +
R
Staveley Nature Reserve, scrape creation  +
D
Stenån River Valley (photo.Outi Laamanen)  +
I
Straightened Isar (left) and restored diversified channel (Right)  +
A
Straightened section of the Allt Lorgy Burn  +
R
D
Summary of the project (Source: Smage Aa).  +
S
Surface of the Eyot showing features and elevation  +
R
THe River Korvajoki after restoration year 2013 (photo J. Huhtala)  +
K
The 2 metre high Kentchurch Weir, prior to removal. Courtesy of Atkins.  +
T
The Babina - present situation  +
C