Property:Picture description
Jump to navigation
Jump to search
This is a property of type String.
R
Restored Knutsinvirta (photo: Harri Aulaskari) +
Restored area in the rapids of Koveroinen (photo Pinja Kasvio) +
Restored bed level and bank profile following restoration (Nov 2012) +
Restored channel - berm feature installed to narrow channel. Courtesy of the River Restoration Centre. +
L
Restored channel in Anderson Park - site of former pond. Channel constrained by hidden gabion baskets to restrict lateral migration. Courtesy of Gareth Greer - Rivers Agency (Northern Ireland). +
R
Restored channel shortly after works +
M
Restored meander +
S
Restored meander eighteen months after project works finished, looking upstream © RRC, July 2014 +
R
Restored section of River Tat, March 2014 +
S
Restored section of Wensum at Sculthorpe Moor +
R
Return of diversified flows on the Fontenelle, 8 months after the restoration (Arnaud Rosan, SMBVCS) +
W
Reveted bank at Westborough post works +
P
Revetment work to prevent erosion on the upper Wye tributary, the Clywedog, carried out with funding from WFD. +
O
Riparian Buffer Strips and Tree Planting +
C
Riparian trees planted along the bank of the river, connecting to remnant riparian woodland and covering areas of the bank embankment that are breached earliest by out of channel flow. +
S
Riparian zone restoration Sept 2020 +
R
Rirobacken brook after restauration_summer 2011 (photo: Airi Kulmala) +
K
River Aire - St Ann's Mill Weir c.The Aire Rivers Trust +
R
River Akerselva at the Kuba Park (Kubaparken) in 2016. Photo: Oslo Municipality, Agency for Urban Environment. +
River Aller Stage 0 +