Property:River corridor measure

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
E
Removal of irrigation canals  +, Elimination of structural elements concreted  +, Removal of exotic plants  +
R
Removal of exotic plants  +, Elimination of structural elements concreted  +
Removal of exotic plants  +, Elimination of structural elements concreted  +
N
Ensure floodplains left unmodified  +
R
Erosion protection  +
D
Erosion protection  +
T
R
C
Excavation for floodplain creation  +
M
Floodplain reconnection  +, Sustainable urban drainage ponds (SUDs)  +, Excavation for floodplain creation  +,
R
Excavation for floodplain creation  +
W
Extensive planting  +, Vegetation management  +, Increase water retention area  +
R
Fencing  +
T
Fencing  +, fenced drinking points  +
H
Fencing  +, Tree planting  +
S
C
D