Case study:Doñana 2005

From RESTORE
Revision as of 14:29, 13 December 2012 by InfoMan (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 37° 0' 21.03" N, 6° 26' 51.36" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes
Country Spain
Main contact forename to be filled
Main contact surname to be filled
Main contact user ID
Contact organisation MARM
Contact organisation web site
Partner organisations
This is a parent project
encompassing the following
projects
Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros, Recovery "CañoTravieso", Recovery of the functionality of Brazo de la Torre, Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes, Restoration of the marsh "Gallega", Restoration of the stream of the Partido
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment



Site

Edit site
Name
WFD water body codes
WFD (national) typology Sinuous
WFD water body name
Pre-project morphology Tidal, Sinuous
Reference morphology Tidal
Desired post project morphology
Heavily modified water body false
National/international site designation
Local/regional site designations National Park, Tidal
Protected species present
Invasive species present
Species of interest
Dominant hydrology Silt, Clay, Sand
Dominant substrate Extensive agriculture, Wetland
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient April"April" is not a number.
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started
Works started November/01/01
Works completed
Project completed
Total cost category
Total cost (k€) FEDER k€"FEDER k€" is not a number.
Benefit to cost ratio
Funding sources C.H.Guadalquivir, Tragsatec

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring Structure & condition of riparian zones



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure Landscape enhancement
Hydromorphology
Biology
Physico-chemical Pollution incident, Flood defence
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications Removal of contaminated material, Restoring function of wetlands
Floodplain / River corridor
Planform / Channel pattern Landscape improvement of the area of the spill
Other Creating the post of Coordinator to drive the project "Doñana 2005"
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other Quantity & dynamics of flow, Continuity of sediment transport, Structure & condition of riparian zones


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]] Before measures implemented After measures implemented Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]]

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]] Pollution incident"Pollution incident" is not in the list (Improvement, Inconclusive, Awaiting results, Deterioration, No change) of allowed values for the "Physico-chemical monitoring result" property.

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Before measures implemented After measures implemented Qualitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information