Case study:Environmental restoration of the river Zújar
Jump to navigation
Jump to search
This case study is pending approval by a RiverWiki administrator.
Location: none specified
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Spain"Spain" is not in the list (Economic aspects, Environmental flows and water resources, Fisheries, Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - agriculture, Land use management - forestry, Monitoring, ...) of allowed values for the "Theme" property. |
Country | C.H.Guadiana |
Main contact forename | |
Main contact surname | |
Main contact user ID | |
Contact organisation | MARM |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz., Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz., Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz., Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz. |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | C.H.Guadiana |
---|---|
River basin | Guadiana |
Subcatchment
River name | Zùjar |
---|---|
Area category | 1000 - 10000 km² |
Area (km2) | |
Maximum altitude category | |
Maximum altitude (m) | 285285 m <br />0.285 km <br />28,500 cm <br /> |
Dominant geology | Siliceous |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | |
Waterbody ID |
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | Sinuous |
WFD water body name | |
Pre-project morphology | Sinuous |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | Site of Community Importance |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | Extensive agriculture, Urban |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | > 10000/00/01"> 10000/00/01" contains a sequence that could not be interpreted against an available match matrix for date components. |
Project completed | |
Total cost category | 16245 k€"16245 k€" is not in the list (Less than 1 k€, 1 - 10 k€, 10 - 50 k€, 50 - 100 k€, 100 - 500 k€, 500 - 1000 k€, 1000 - 5000 k€, 5000 - 10000 k€, more than 10000 k€) of allowed values for the "Total cost category" property. |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | C.H.Guadiana |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring | Structure & condition of riparian zones |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Recovery of channel morphology |
Floodplain / River corridor | |
Planform / Channel pattern | Protecting and promoting wildlife, Assessment and monitoring program |
Other | Conditioning of recreational areas |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other | Continuity for organisms, Channel pattern/planform, Structure & condition of riparian zones |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] | Before measures implemented | After measures implemented | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] | Landscape enhancement"Landscape enhancement" is not in the list (Improvement, Inconclusive, Awaiting results, Deterioration, No change) of allowed values for the "Physico-chemical monitoring result" property. |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Before measures implemented | After measures implemented | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|