Case study:Dunruchan Farm Peatland Restoration Project

From RESTORE
Revision as of 12:01, 8 November 2018 by Alexrrc (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 56° 18' 21.83" N, 3° 57' 40.28" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Flood risk management, Habitat and biodiversity, Water quality
Country Scotland
Main contact forename Laurence
Main contact surname Belleni
Main contact user ID
Contact organisation River Forth Fisheries Trust
Contact organisation web site http://www.fishforth.co.uk/rfft/
Partner organisations Scottish Government, Scottish Natural Heritage, Drummond Estates, Dunruchan Farm
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


The Allan Water catchment has 3 Potentially Vulnerable Areas to flood risk as determined in the National Flood Risk Assessment 2009. The scoping study for this project used hydrological modelling that identified the Knaik subcatchment as contributing on average 23% of the flood peak which occurs in the most downstream PVA in the catchment. Hillsides with fast flow pathways due to hill grips is one reason the Knaik subcatchment has such an impact on the Allan Water flood peak. The project identified an area of the Knaik subcatchment where extensive hill grips were present and work was possible. By using measures such as peat dams and wooden sediment traps, fast water conveyance was attenuated and the blanket bog habitat was restored. The Dunruchan Farm Peatland Restoration Project restored 48.2ha of extensively drained upland blanket bog at just under 300m altitude by using approximately 790 peat dams, 10.4km (10,365m) ditch and gully reprofiling, 6 wooden sediment traps, one 10m bund, 30m worth of in-ditch bunds and 7 plastic dams. Research opportunities to look into the impact of the project on downstream flood risk and wider ecosystem benefits are currently being investigated. The Knaik subcatchment covers 39km² while the restored area is 0.482km² (1.2%), and so the effect may only be local. If the project's impact is considered as part of a wider network of NFM measures in the Allan Water catchment, however, the cumulative impact may be more significant.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name River Knaik, Allan Water
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2015
Works started
Works completed
Project completed
Total cost category
Total cost (k€) £37k"£" is not declared as a valid unit of measurement for this property.
Benefit to cost ratio
Funding sources Scottish Natural Heritage, Scottish Government

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information