Project overview
Status | Complete |
---|---|
Project web site | http://projektwebbar.lansstyrelsen.se/rolfsan/Sv/Pages/default.aspx |
Themes | Fisheries, Habitat and biodiversity, Hydropower |
Country | Sweden |
Main contact forename | Anna |
Main contact surname | Ek |
Main contact user ID | |
Contact organisation | County Administrative Board of Västra Götaland |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
Apelnäs fishway at River Rolfså, Bosgården nature-like fishway at River Rolfså, Dam removal at Grönkullen, River Rolfsån, Restorations of River Nolån-Hulta dam removal, ´Restorations of River Nolån-Bypass channel in Hulta Hydro power plant, ´Restorations of River Nolån-Fishway in Forsa hydro power plant, Ålgårda nature-like bypass channel at River Rolfsån |
Project summary
The River Rolfsån in South West Sweden was restored for sea trout, rare lake trout, salmon and river pearl mussel. The river has been classified as extremely valuable by its natural characteristics which were deteriorated by two water power plants built in 1940's and 1950's. Because of the power plants the fish were completely unable to migrate between the sea and river. The watercourse continues upstream where there are five lakes and two other rivers with more hydro power plants. There have also been restorations in the other two rivers including dam removals, building fish passages, habitat restorations and rising the minimum flow of the rivers (by buying water). In 2009 a fish passage was built to the Myrekulla kvarn mill after which the migrants have been able to rise upstream.
The project was managed and mostly financed by the Länsstyrelse/Västra Götaland (regional environmental authority). The rest of the financing has been organized by the national environmental institute, Naturvårdsvärket, who is responsible for targeting the money collected from the hydro power companies to the watercourses which have been deteriorated by hydro power production.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Skagerrak and Kattegat River basin |
---|---|
River basin | Rolfsån River Basin |
Subcatchment
River name | River Rolfsån |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | Organic (i.e. Peat) |
Ecoregion | Fenno-Scandian Shield |
Dominant land cover | Woodland, Intensive agriculture (arable) |
Waterbody ID |
Other case studies in this subcatchment: Apelnäs fishway at River Rolfså, Bosgården nature-like fishway at River Rolfså, Dam removal at Grönkullen, River Rolfsån, Restorations of River Nolån-Hulta dam removal, ´Restorations of River Nolån-Bypass channel in Hulta Hydro power plant, ´Restorations of River Nolån-Fishway in Forsa hydro power plant, Ålgårda nature-like bypass channel at River Rolfsån
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | There were several dams |
Reference morphology | To take off old dams and build fisways next to relevant dams |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | EU - Special Area of Conservation |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | Gravel, Sand, Cobble |
River corridor land use | Woodland |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2006/01/01 |
Works started | |
Works completed | 2012/01/01 |
Project completed | |
Total cost category | 100 - 500 k€ |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | County Administrative Board of Västra Götaland, Federal Nature Protection Agency, Energy company producing water electricity (Göteborg Energi) |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | County Administrative Board of Västra Götaland | Anna | Ek | ||
Stakeholder engagement and communication | County Administrative Board of Västra Götaland | Anna | Ek | ||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Removal of old dams, Building fishways |
Floodplain / River corridor | |
Planform / Channel pattern | Removal of old dams, Building fishways |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Continuity for organisms |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish: Disturbance-sensitive species | ||||||
Fish: Abundance | ||||||
Fish: Species composition | ||||||
Invertebrates: Disturbance-sensitive species |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|