Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | Romania |
Main contact forename | Anca |
Main contact surname | Savin |
Main contact user ID | |
Contact organisation | Prut - Barlad River Basin Authority |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Danube |
---|---|
River basin | Prut Barlad |
Subcatchment
River name | Prut |
---|---|
Area category | Less than 10 km² |
Area (km2) | |
Maximum altitude category | 100 - 200 m |
Maximum altitude (m) | |
Dominant geology | Siliceous |
Ecoregion | Eastern Plains |
Dominant land cover | |
Waterbody ID |
Other case studies in this subcatchment: Ecological Restoration of Mata-Radeanu Complex, Ecological Restoration of Natural Lake Pochina, Ecological Restoration of Vlascuta Lake
Site
Name | Ciobarciu |
---|---|
WFD water body codes | RORW13.1.15_B5 |
WFD (national) typology | RO09a |
WFD water body name | |
Pre-project morphology | Embanked |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | EU - Special Protected Area |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Artificially regulated |
Dominant substrate | Silt |
River corridor land use | Intensive agriculture (arable) |
Average bankfull channel width category | Less than 2 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 0.5 - 2 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | 0.5 - 6"-6" is not declared as a valid unit of measurement for this property. |
Average channel gradient category | |
Average channel gradient | 0.001 |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 5,500 m5.5 km <br />550,000 cm <br /> |
---|---|
Project started | 2003/03/01 |
Works started | 2006/06/01 |
Works completed | 2006/10/01 |
Project completed | |
Total cost category | 100 - 500 k€ |
Total cost (k€) | 388 k€388,000 € <br /> |
Benefit to cost ratio | |
Funding sources | The Netherlands Gouvernment program
MATRA; Co-financing Ministry of Environment and Water Management |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | Regional water authority Hunze & Aa’s www.hunzeenaas.nl | Albert | Remmelzwaal | ||
Stakeholder engagement and communication | Prut - Barlad River Basin Authority | Dan | Badarau | ||
Works and works supervision | Prut - Barlad River Basin Authority | Anca | Savin | ||
Post-project management and maintenance | |||||
Monitoring | Prut - Barlad River Basin Authority |
Reasons for river restoration
Mitigation of a pressure | Flood risk management |
---|---|
Hydromorphology | Continuity for organisms |
Biology | |
Physico-chemical | Nutrient concentrations |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | Creation of wetlands/removal of embankments |
Planform / Channel pattern | Re-instatement of old course |
Other | Restoration flow on old Jijia |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | Land purchase/Improved public access |
Other | Consultation |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Continuity for organisms | Improvement |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish: Species composition | Improvement |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|