Case study:Historic Mill Restoration Project

From RESTORE
Revision as of 07:33, 3 October 2013 by Marinela (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 54° 54' 46.21" N, 8° 50' 21.08" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Economic aspects, Habitat and biodiversity, Social benefits
Country Denmark
Main contact forename Hans
Main contact surname Ole Hansen
Main contact user ID
Contact organisation
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Area of the project

Project summary

Edit project overview to modify the project summary.


Reducing the risk of flooding, tackling subsidence and improving access for fish was dealt with by removing sluice gates and installing a weir allowing fish to swim over more easily. Retaining the historic mill and mill pond were central to the scheme. Economic, social and environmental benefits have been reported in a project that dealt sensitively with the cultural heritage at the site. Works: 1. The mill pond and river were separated with a sheet-piled, concrete-faced weir. Flood banks were set back to increase capacity for flood waters. 2. Sluice gates and the fish ladder upstream of the mill bridge were removed. The millpond was retained as a functioning nursery area for fish. 3. Downstream of the mill, spawning grounds were formed by creating areas of shallower water using gravel (riffles). Resting areas (backwaters) were created and an otter pass was built under the bridge. 4. A new access point downstream of the mill was made for the Tønder Rowing Club to minimise disturbance to nature. 5. 700m of wetlands was created downstream of Tønder to create a wider nature corridor. This has been very popular with walkers and local people. Benefits: Historic mill retained; Aesthetic improvements have led to an increase in local house prices; Public access to nature improved - wetland walk; Balanced project aims with recreational needs; Improved river habitat; Fish pass more freely past the mill; Passage for houting has been restored.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

Edit project overview to modify the lessons learnt.


• Taking into account the historic context of the site, the project was delivered sensitively. • The legacy of the project will benefit wildlife and people in a number of ways (access to nature, recreation).


Image gallery


Lateral sheet piling used to create the weir
Sheet piling faced with concret
The structure once vegetated
Cultural legacy: Historic Mill retained
Bachmanns Mill Pond - after restoration (1)
Bachmanns Mill Pond - after restoration (2)
Bachmanns Mill Pond - after restoration (3)
Bachmanns Mill pond - before restoration
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information