Case study:Valtellina 2005 – New green system
Jump to navigation
Jump to search
This case study is pending approval by a RiverWiki administrator.
Location: 46° 8' 32.97" N, 9° 35' 29.62" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Italy |
Main contact forename | Italo |
Main contact surname | Buzzetti |
Main contact user ID | |
Contact organisation | ERSAF – Unità Operativa di Morbegno (SO) |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Padano |
---|---|
River basin | Fiume Po |
Subcatchment
River name | Adda |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | more than 2000 m |
Maximum altitude (m) | 2237 m2.237 km <br />223,700 cm <br /> |
Dominant geology | Siliceous |
Ecoregion | Alps |
Dominant land cover | Woodland |
Waterbody ID |
Site
Name | Parco della Bosca |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | wandering |
Reference morphology | wandering |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Quick run-off |
Dominant substrate | Cobble |
River corridor land use | Intensive agriculture |
Average bankfull channel width category | more than 50 m |
Average bankfull channel width (m) | 7575 m <br />0.075 km <br />7,500 cm <br /> |
Average bankfull channel depth category | 02/05/12 m"02/05/12 m" is not in the list (Less than 0.5 m, 0.5 - 2 m, 2 - 5 m, 5 - 10 m, more than 10 m) of allowed values for the "Average channel depth category" property. |
Average bankfull channel depth (m) | 3.5 m0.0035 km <br />350 cm <br /> |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | 0.005 |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 2000 m2 km <br />200,000 cm <br /> |
---|---|
Project started | 2006/06/01 |
Works started | 2009/06/01 |
Works completed | 2010/11/01 |
Project completed | |
Total cost category | 1000 - 5000 k€ |
Total cost (k€) | 1058 k€1,058,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Regione Lombardia and sediments sellling, Lombardia Region |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | 10 - 50 k€ | 27 k€27,000 € <br /> | Forest Service - Sondrio County | Paola | Bianchi |
Stakeholder engagement and communication | |||||
Works and works supervision | 500 - 1000 k€ | 970 k€970,000 € <br /> | ERSAF – Morbegno (SO) | Italo | Buzzetti |
Post-project management and maintenance | 50 - 100 k€ | 54 k€54,000 € <br /> | ERSAF – Morbegno (SO) | Italo | Buzzetti |
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Reduce gradient of banks and reforestation |
Floodplain / River corridor | Excavation for floodplain creation, Requalification and improvement of forestal cover along corridor, Alloctone species control |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | 3 years monitoring to reduce alloctone species ricolonization |
Social measures (incl. engagement) | |
Other | Consultation |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|