Case study:Zero river restoration project

From RESTORE
Revision as of 14:49, 28 March 2013 by Bozbru (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 45° 33' 41.77" N, 12° 20' 7.28" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Flood risk management, Habitat and biodiversity, Land use management - agriculture, Land use management - forestry, Monitoring, Social benefits, Water quality
Country Italy
Main contact forename Paolo
Main contact surname Cornelio
Main contact user ID
Contact organisation p.cornelio@acquerisorgive.it
Contact organisation web site http://http://www.acquerisorgive.it/
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
The Zero river at the beginning of the restored portion

Project summary

Edit project overview to modify the project summary.


The Consorzio di Bonifica Acque Risorgive (drainage authority) is located within the pumped drainage landscape of the Venice Lagoon. The Consorzio was involved in a big project aimed at developing a catchment strategy to reduce nutrient loads entering the Venice Lagoon from its rivers. To achieve this goal, the Consorzio planned a major river restoration project for the Zero River, which drains into the lagoon. The main restoration actions carried out regarded: banks widening, increase of aquatic vegetation on river terraces, creation of lateral and inflow wetland (ponds and lakes) and creation of wooded riparian area irrigated by river water. Within this project a pilot experimental system was built along the Zero River, to evaluate in particular the buffering efficiency of the wooded areas on non-point pollution sources of nitrogen. On the experimental site, represented by a newly-established riparian woodland, the hydrology of the woodland is totally regulated through a series of pumps which irrigate the woodland with water coming from Zero River, through a series of parallel ditches (irrigation and drainage ditches). The results of this study provided interesting suggestions for improving the management of riparian buffer zones.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district Alpi Orientali
River basin Bacino scolante della Laguna di Venezia

Subcatchment

River name Bacino scolante della Laguna di Venezia
Area category 1000 - 10000 km²
Area (km2) 2,0382,038 km² <br />203,800 ha <br />
Maximum altitude category 100 - 200 m
Maximum altitude (m)
Dominant geology
Ecoregion Italy and Corsica
Dominant land cover Intensive agriculture (arable)
Waterbody ID



Other case studies in this subcatchment: Pagana canal restoration project, Rio San Martino and Piovega di Scandolara restoration project, Rio Sant'Ambrogio restoration project, Salzano wetland and Marzenego river restoration project, Scolo Desolino restoration project


Site

Edit site
Name Zero river
WFD water body codes 673_32
WFD (national) typology
WFD water body name Zero river
Pre-project morphology Artificial channel
Reference morphology Low gradient passively meandering
Desired post project morphology
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present Yes
Invasive species present Yes
Species of interest
Dominant hydrology Groundwater
Dominant substrate Clay
River corridor land use Intensive agriculture (arable)
Average bankfull channel width category 10 - 50 m
Average bankfull channel width (m)
Average bankfull channel depth category 2 - 5 m
Average bankfull channel depth (m)
Mean discharge category 1 - 10 m³/s
Mean annual discharge (m3/s)
Average channel gradient category 0.001 - 0.01
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m) 7,0007,000 m <br />7 km <br />700,000 cm <br />
Project started 1999
Works started
Works completed
Project completed 2004/01/01
Total cost category 5000 - 10000 k€
Total cost (k€) 7,2307,230 k€ <br />7,230,000 € <br />
Benefit to cost ratio
Funding sources Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000”

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure Nutrient removal to reduce eutrophication, reduce flood risk
Hydromorphology Create a more natural and wide channel morphology
Biology Increase ecological status of Fish, Macrophytes, Macrozoobenthos
Physico-chemical Reduce Nitrogen, Phosphorous and Organic pollution
Other reasons for the project Increase fruition and biodiversity in general in a agricultural and urban contest


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information