Case study:Refilling the meanders of the Colostre: Difference between revisions

From RESTORE
Jump to navigation Jump to search
(XML import)
 
No edit summary
Line 8: Line 8:
}}
}}
{{Location
{{Location
|Location=
|Location=43.7997869, 6.041144000000002
   
   
     
}}
}}
{{Project_overview
{{Project_overview

Revision as of 20:24, 30 April 2013

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 43° 47' 59.23" N, 6° 2' 28.12" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes
Country France
Main contact forename Vincent
Main contact surname Duru
Main contact user ID
Contact organisation FDPPMA Alpes-de-Haute-Provence
Contact organisation web site
Partner organisations
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district Alpes-de-Haute-Provence
River basin Rhône-Mediterranean

Subcatchment

River name Colostre
Area category 100 - 1000 km²
Area (km2) 215 km²21,500 ha <br />
Maximum altitude category
Maximum altitude (m)
Dominant geology
Ecoregion Alps
Dominant land cover
Waterbody ID



Site

Edit site
Name Regional Natural Park of Verdon
WFD water body codes FRDR251
WFD (national) typology
WFD water body name
Pre-project morphology Single channel, Straight
Reference morphology Sinuous
Desired post project morphology
Heavily modified water body true
National/international site designation EU - Special Protected Area
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology Quick run-off, Artificially regulated
Dominant substrate
River corridor land use
Average bankfull channel width category 2 - 5 m
Average bankfull channel width (m) 44 m <br />0.004 km <br />400 cm <br />
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s) 0.670.67 m³/s <br />670 l/s <br />
Average channel gradient category
Average channel gradient 1e-005
Average unit stream power (W/m2) 0.0164267250.0164 W/m² <br />


Project background

Edit project background
Reach length directly affected (m) 11000 m11 km <br />1,100,000 cm <br />
Project started 1996/01/01
Works started 1999/01/01
Works completed 2001/01/01
Project completed
Total cost category 50 - 100 k€
Total cost (k€) 66 k€66,000 € <br />
Benefit to cost ratio
Funding sources Water Agency, Regional Council, Dèpartment-level Council, Higher Fishing Council, Local fishing associations

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision 50 - 100 k€ 66 k€66,000 € <br /> Conseil Supérior de la Pêche-Departmental Brigade
Post-project management and maintenance Conseil Général (Départment Level Council)
Monitoring Conseil Supérior de la Pêche-Departmental Brigade



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology Continuity for organisms, Continuity of sediment transport, Width & depth variation, Structure & condition of riparian zones, Channel pattern/planform
Biology Fish: Abundance, Fish: Disturbance-sensitive species
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications Removal of weirs
Floodplain / River corridor
Planform / Channel pattern Removal of poplars in old meanders, Re-meandering
Other
Non-structural measures
Management interventions
Social measures (incl. engagement) Agreement with the owners, Public meetings in each commun affected by the project
Other River contract


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish: Species composition Yes Yes Yes Improvement
Macrophytes & phytobenthos: Taxonomic composition Yes Improvement

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Presence of beavers Yes Improvement


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information