Case study:Restoration project in Verde River: Difference between revisions
(XML import) |
No edit summary |
||
Line 13: | Line 13: | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Country=Spain | |||
|Main contact forename=C.H.Júcar | |||
|Main contact surname=C.H.Júcar | |||
|Contact organisation=C.H.Júcar | |||
|Multi-site=No | |||
|Project summary=The restoration project in Verde River comprises the whole of it, between his source in the springs of Benimodo-Massalavés (Valencia province) and its mouth in the river Júcar on its left bank, just before the confluence of the river Magro. The purpose of the restoration of the Rio Verde is the recovery of good ecological status, required for the WFD by 2015. Thus, the actions proposed are targets in the short and long term, all framed in ENRR and the WFD. | |||
The main project objectives are, in short term, conditioning of DPH to improve the functioning natural hydraulic channel; increase river mobility space; conservation of riparian ecosystems; maintenance and improvement of current vegetation conditions; control of exotic vegetation; increased diversity of plant cover; improving the mobility of fish fauna; landscaping adjustment and environmental restoration of degraded areas; adaptation and promotion of social use the river. | |||
|Country= | Long term: Improve the river dynamics; enhancement of riparian forest development; improving the aquatic environment and associated land to allow regeneration and diversification of the fauna; promoting social use of the river more attractive and environmentally; promote integration of use policies and land management with the use and management of rivers, with sustainability criteria. | ||
|Main contact forename= | |||
|Main contact surname= | |||
|Contact organisation= | |||
|Multi-site= | |||
|Project | |||
}} | }} | ||
{{Case_study_subcatchment | {{Case_study_subcatchment |
Revision as of 08:22, 21 February 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | C.H.Júcar |
Main contact surname | C.H.Júcar |
Main contact user ID | |
Contact organisation | C.H.Júcar |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The restoration project in Verde River comprises the whole of it, between his source in the springs of Benimodo-Massalavés (Valencia province) and its mouth in the river Júcar on its left bank, just before the confluence of the river Magro. The purpose of the restoration of the Rio Verde is the recovery of good ecological status, required for the WFD by 2015. Thus, the actions proposed are targets in the short and long term, all framed in ENRR and the WFD.
The main project objectives are, in short term, conditioning of DPH to improve the functioning natural hydraulic channel; increase river mobility space; conservation of riparian ecosystems; maintenance and improvement of current vegetation conditions; control of exotic vegetation; increased diversity of plant cover; improving the mobility of fish fauna; landscaping adjustment and environmental restoration of degraded areas; adaptation and promotion of social use the river.
Long term: Improve the river dynamics; enhancement of riparian forest development; improving the aquatic environment and associated land to allow regeneration and diversification of the fauna; promoting social use of the river more attractive and environmentally; promote integration of use policies and land management with the use and management of rivers, with sustainability criteria.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | C.H.Júcar |
---|---|
River basin | Júcar |
Subcatchment
River name | Verde |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | |
Waterbody ID |
Site
Name | Restauración del río Verde en los municipios de Benimodo, Massalvés, Alberique y Alzira (Valencia) |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | Site of Community Importance |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 14000 m14 km <br />1,400,000 cm <br /> |
---|---|
Project started | 2008/01/01 |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | MARM |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | ARIN (Arquitectos/Ingenieros Consultores S.A.) | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Recess side slopes, Barriers removal |
Floodplain / River corridor | Removal of exotic plants, Elimination of structural elements concreted |
Planform / Channel pattern | Removal of speckles |
Other | |
Non-structural measures
| |
Management interventions | Improve forest management and agricultural |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|