Case study:Restoration project of the degraded area of the Molí source environment and improvement of river areas and adjacent riparian formations: Difference between revisions
No edit summary |
No edit summary |
||
Line 192: | Line 192: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{ | {{Image gallery}} | ||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009.jpg | |||
|Caption=Map of the restoration area | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 I.jpg | |||
|Caption=Map of the restoration area | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 II.jpg | |||
|Caption=Aerial view of the restoration area | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 III.jpg | |||
|Caption=Photos of the area before works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 IV.jpg | |||
|Caption=Photos of the area before works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 V.jpg | |||
|Caption=Photos of the area before works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 VI.jpg | |||
|Caption=Photos of the area before works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 VII.jpg | |||
|Caption=Photos of the area during works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 VIII.jpg | |||
|Caption=Photos of the area during works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 IX.jpg | |||
|Caption=Photos of the area during works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 X.jpg | |||
|Caption=Photos of the area after works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 XI.jpg | |||
|Caption=Photos of the area after works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 XII.jpg | |||
|Caption=Photos of the area after works | |||
}} | |||
{{Image_gallery_end}} | {{Image_gallery_end}} | ||
{{Additional Documents}} | {{Additional Documents}} |
Revision as of 08:45, 19 February 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | Naturalea S.L. |
Main contact surname | Naturalea S.L. |
Main contact user ID | |
Contact organisation | Naturalea S.L. |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The area to be restored has been divided into two sections. In the first, there is a medieval wall damaged by time and erosion visible on the slope that separates the river bed. In the second, we see the effects of erosion caused by a channel: nearly vertical slope with landslides in some areas.
The main actions in this project are: the use of new bioengineering elements in order to stabilize slope banks and to prevent erosion in town wall; replaced the hard defenses by bioengineering structures; facilitate natural regeneration of riparian vegetation.
The project has a total budget of 94.788,5 € and is financed by the Municipality of Besalú.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Pirineo Oriental |
---|---|
River basin | El Fluviá |
Subcatchment
River name | El Fluviá |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | 100 - 200 m |
Maximum altitude (m) | 140 m0.14 km <br />14,000 cm <br /> |
Dominant geology | |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | Urban |
Waterbody ID |
Site
Name | Besalú |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | Urban |
Average bankfull channel width category | 10 - 50 m |
Average bankfull channel width (m) | 1818 m <br />0.018 km <br />1,800 cm <br /> |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 108 m0.108 km <br />10,800 cm <br /> |
---|---|
Project started | 2008/01/01 |
Works started | |
Works completed | 2008/03/01 |
Project completed | |
Total cost category | 50 - 100 k€ |
Total cost (k€) | 94 k€94,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Municipality of Besalú |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | Naturalea, S.L. | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | Channel pattern/planform, Structure & condition of riparian zones |
Biology | |
Physico-chemical | |
Other reasons for the project | Bank erosion |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | New bioengineering elements in order to stabilize slope banks, Bank stabilization and erosion protection |
Floodplain / River corridor | Riparian vegetation improvement |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|