Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga: Difference between revisions
No edit summary |
No edit summary |
||
Line 192: | Line 192: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{ | {{Image gallery}} | ||
{{Case study image | |||
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007.jpg | |||
|Caption=Map of the restoration area | |||
}} | |||
{{Case study image | |||
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 I.jpg | |||
|Caption=Map of the restoration area | |||
}} | |||
{{Case study image | |||
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 II.jpg | |||
|Caption=Aerial view of the restoration area | |||
}} | |||
{{Case study image | |||
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 III.jpg | |||
|Caption=Photos of the area before works | |||
}} | |||
{{Case study image | |||
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 IV.jpg | |||
|Caption=Photos of the area before works | |||
}} | |||
{{Case study image | |||
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 V.jpg | |||
|Caption=Krainer type network placed in the area | |||
}} | |||
{{Case study image | |||
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 VI.jpg | |||
|Caption=Krainer type network placed in the area | |||
}} | |||
{{Case study image | |||
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 VII.jpg | |||
|Caption=Krainer type network placed in the area | |||
}} | |||
{{Case study image | |||
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 VIII.jpg | |||
|Caption=Photos of the removal of American reed (Arundo donax) | |||
}} | |||
{{Case study image | |||
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 IX.jpg | |||
|Caption=Photos of the removal of American reed (Arundo donax) | |||
}} | |||
{{Case study image | |||
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 X.jpg | |||
|Caption=Photos of the area before and after works | |||
}} | |||
{{Case study image | |||
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 XI.jpg | |||
|Caption=Photos of the area before and after works | |||
}} | |||
{{Case study image | |||
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 XII.jpg | |||
|Caption=Photos of the area before and after works | |||
}} | |||
{{Image_gallery_end}} | {{Image_gallery_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} |
Revision as of 08:29, 19 February 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | Naturalea S.L. |
Main contact surname | Naturalea S.L. |
Main contact user ID | |
Contact organisation | Naturalea S.L. |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The restored section has a length of 650m, a common channel between 4 and 6 m and a width of 35m in ordinary floods. The slope of the river terrace is bound by dikes and embankments in some places not stabilized in others and longitudinal continuity of the river influenced by two rip-raps. There are occupations of the river area for industrial activities and eventually discharges of debris. As relevant to vegetation, effects of overgrazing are detected and a significant proliferation of exotic species.
The main objectives of this project are: limit the presence and possible expansion of invasive exotic species of vascular plants; removal of non-functional riprap stretches the right margin; increase morphological heterogeneity in the right margin; promote the recovery of native riparian vegetation; minimize the impact of human activities taking place in the fluvial environment and are likely to maintain or produce impacts; improving the landscape and the river ecosystem.
The project has a total budget of 155.568,08 € and is financed by the Consorci of Besós.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Pirineo Oriental |
---|---|
River basin | Besós |
Subcatchment
River name | Congost |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | 210 m0.21 km <br />21,000 cm <br /> |
Dominant geology | |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | |
Waterbody ID |
Site
Name | Río Congost |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Sinuous |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | 5 - 10 m |
Average bankfull channel width (m) | 66 m <br />0.006 km <br />600 cm <br /> |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 650 m0.65 km <br />65,000 cm <br /> |
---|---|
Project started | 2009/11/01 |
Works started | |
Works completed | 2010/03/01 |
Project completed | |
Total cost category | 100 - 500 k€ |
Total cost (k€) | 155 k€155,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Consorci del Besós |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | Naturalea, S.L. | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | Channel pattern/planform, Structure & condition of riparian zones |
Biology | |
Physico-chemical | |
Other reasons for the project | Landscape enhancement |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | New bioengineering elements in order to stabilize slope banks, Removal rip-rap |
Floodplain / River corridor | Removal of exotic plants |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|