Case study:Restoration project in the stream of the Vall d'Horta and surrounds. Natural Park of Sant Llorenç del Munt i l'Obac.: Difference between revisions
No edit summary |
No edit summary |
||
Line 194: | Line 194: | ||
{{Image_gallery}} | {{Image_gallery}} | ||
{{Image_gallery_end}} | {{Image_gallery_end}} | ||
{{ | {{Additional Documents}} | ||
{{Case study documents | |||
|File name=049 Riera de la Vall dHorta.pdf | |||
|Description=Additional documentation (in Spanish) | |||
}} | |||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{Additional_links_and_references_header}} | {{Additional_links_and_references_header}} |
Revision as of 10:50, 18 February 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | Naturalea S.L. |
Main contact surname | Naturalea S.L. |
Main contact user ID | |
Contact organisation | Naturalea S.L. |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The work carried out aims to improve the processes of regeneration and improvement of forest structure, minimize erosion, improve the social use, improve the drainage of the stream and the biological connection of a weir with a fish ladder and rehabilitate different habitats.
The main objectives of this project are improved post-fire forest structure with the removal of dead wood and selective pruning of some feet; improvement of plant diversity by planting species; improving the dynamics of the stream; promote the area as a recreation space the stream and the home environment of the Muntada; sort the area to prevent environmental deterioration (erosion, loss of soil and plant diversity, etc..); landscape integration of the work done.
The project has a total budget of 72.226 € and is financed by the Council of Barcelona and by the Natural Park Sant Llorenç de Munt i l'Obac.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Pirineo Oriental |
---|---|
River basin | Besós |
Subcatchment
River name | Riera de la Val d'Horta |
---|---|
Area category | Less than 10 km² |
Area (km2) | 6 km²600 ha <br /> |
Maximum altitude category | 500 - 1000 m |
Maximum altitude (m) | 510 m0.51 km <br />51,000 cm <br /> |
Dominant geology | |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | |
Waterbody ID |
Other case studies in this subcatchment: Restoration project in the stream of the Vall d'Horta and surrounds. Natural Park of Sant Llorenç del Munt i l'Obac.
Site
Name | Riera de la Val d'Horta |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Sinuous |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | 2 - 5 m |
Average bankfull channel width (m) | 33 m <br />0.003 km <br />300 cm <br /> |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 2015 m2.015 km <br />201,500 cm <br /> |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | 50 - 100 k€ |
Total cost (k€) | 72 k€72,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Council of Barcelona, PN Sant Llorenç de Munt i l'Obac |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | Naturalea, S.L. | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | New bioengineering elements in order to stabilize slope banks, Installing fish scale |
Floodplain / River corridor | Cutting or pruning health of individuals affected by the fire to accelerate natural regeneration, Removal of exotic plants |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|