Case study:Fluvial improvement in Riera de Caldés: Difference between revisions
No edit summary |
No edit summary |
||
Line 8: | Line 8: | ||
}} | }} | ||
{{Location | {{Location | ||
|Location | |Location=41.57140760061814, 2.1749496459960938 | ||
}} | }} | ||
{{Project overview | {{Project overview |
Revision as of 11:12, 13 February 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | Naturalea |
Main contact surname | Naturalea |
Main contact user ID | |
Contact organisation | Naturalea Conservació, S.L. |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Caldés is an arroyo located in NE of Spain, in the Besos' Basin. The work area is located in the village of Palau-solitá, near Barcelona. The reach has a length of 5.900 meters and about 34,5 has. As the work area is an urban space, it's important for the local population the accessibility and programs to bring to the attention of the people.
The project of fluvial improvement is aimed to develop and increase the riparian communities in order to ameliorate water quality. There also are local problems that are necessary to solve: local impacts, banks erosion, rip-raps that are obsoletes... One of the main objectives is to improve the quality of the fluvial landscape.
The project includes removal of exotic plants (Arundo donax, Cortadelia seollana…); riparian tree planting with non exotic plants; creation of new habitats for amphibian communities. New bio-engineering techniques are used to develop and help these riparian communities.
The works started in March 2009 and finished in November 2009. All the works were carried out by Natualea Conservació, S.L., a local enterprise.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Pirineo Oriental |
---|---|
River basin | Besós |
Subcatchment
River name | Riera de Caldés |
---|---|
Area category | |
Area (km2) | 1038 km²103,800 ha <br /> |
Maximum altitude category | |
Maximum altitude (m) | 120 m0.12 km <br />12,000 cm <br /> |
Dominant geology | |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | Urban |
Waterbody ID |
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Embanked |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Ephemeral |
Dominant substrate | |
River corridor land use | Urban |
Average bankfull channel width category | 10 - 50 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 5900 m5.9 km <br />590,000 cm <br /> |
---|---|
Project started | 2009/03/01 |
Works started | |
Works completed | 2009/11/01 |
Project completed | |
Total cost category | |
Total cost (k€) | 117 k€117,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Ajuntament de Palau-Solità i Plegamans |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | Naturalea Conservació, S.L. | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Removal of rip-rap elements, New bioengineering elements in order to stabilize slope banks |
Floodplain / River corridor | Riparian tree planting, Removal of exotic plants (Arundo donax, Cortadelia seollana…) |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|