Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica: Difference between revisions

From RESTORE
Jump to navigation Jump to search
(XML import)
 
No edit summary
Line 190: Line 190:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=changed bank slope
   
|Floodplain / River corridor=local deepenings,construction of small wooden weir to prevent uncontrolled deepening,coves and bays construction,construction of the overflows between individual meanders
   
|Planform / Channel pattern=retention of water in depressions and stream branches,ground water level rise,slower runoff of low waters
      changed bank slope
|Other technical measure=,re-instatement of old course;
|Floodplain / River corridor=
|Management interventions=late mowing and mulching on the permanently protected land,mapping  of  habitat  types
      local deepenings,construction of small wooden weir to prevent uncontrolled deepening,coves and bays construction,construction of the overflows between individual meanders
|Wider stakeholder / citizen engagement=popularization  of  the  project,Information provision,education  of  the  youth  on  the importance of nature conservation
|Planform / Channel pattern=
      retention of water in depressions and stream branches,ground water level rise,slower runoff of low waters
|Other technical measure=
      ,re-instatement of old course;
|Management interventions=
     
|Social measures=
      late mowing and mulching on the permanently protected land,mapping  of  habitat  types
|Wider stakeholder / citizen engagement=
      popularization  of  the  project,Information provision,education  of  the  youth  on  the importance of nature conservation
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}

Revision as of 12:26, 23 January 2013

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

4.00
(one vote)


To discuss or comment on this case study, please use the discussion page.


Location: none specified



Project overview

Edit project overview
Status Complete
Project web site
Themes
Country Slovenia
Main contact forename Tanja
Main contact surname Vasilevska
Main contact user ID
Contact organisation Notranjski regijski park
Contact organisation web site
Partner organisations
This is a parent project
encompassing the following
projects
RESTORATION OF THE GORIŠKI BREŽIČEK STREAM, RESTORATION OF THE TRESENEC STREAM
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district Danube River Basin District
River basin Danube

Subcatchment

River name Sava River
Area category 100 - 1000 km²
Area (km2)
Maximum altitude category 200 - 500 m
Maximum altitude (m) 270270 m <br />0.27 km <br />27,000 cm <br />
Dominant geology
Ecoregion Dinaric Western Balkan
Dominant land cover Wetland
Waterbody ID



Other case studies in this subcatchment: HPP Blanca


Site

Edit site
Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology SI141VT2 VTJ Cerkniško jezero (Cerknica lake), Straight
Reference morphology Sinuous
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations No, Ramsar, Special Protection Area
Protected species present
Invasive species present
Species of interest
Dominant hydrology Ephemeral, Quick run-off, we need to check
Dominant substrate Silt
River corridor land use Wetland, Extensive agriculture, Grassland, Woodland
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started January/01/01
Works started
Works completed December/01/01
Project completed
Total cost category 2009 k€"2009 k€" is not in the list (Less than 1 k€, 1 - 10 k€, 10 - 50 k€, 50 - 100 k€, 100 - 500 k€, 500 - 1000 k€, 1000 - 5000 k€, 5000 - 10000 k€, more than 10000 k€) of allowed values for the "Total cost category" property.
Total cost (k€) 1000 - 5000 k€"-5000k€" is not declared as a valid unit of measurement for this property.
Benefit to cost ratio
Funding sources 1840

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Ministry of Environment and Spatial Planning k€"Ministry of Environment and Spatial Planning k€" is not in the list (Less than 1 k€, 1 - 10 k€, 10 - 50 k€, 50 - 100 k€, 100 - 500 k€, 500 - 1000 k€, 1000 - 5000 k€, 5000 - 10000 k€, more than 10000 k€) of allowed values for the "Investigation and design cost category" property.
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology
Biology Quantity & dynamics of flow, Channel pattern/planform, Structure & condition of riparian zones
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications changed bank slope
Floodplain / River corridor local deepenings, construction of small wooden weir to prevent uncontrolled deepening, coves and bays construction, construction of the overflows between individual meanders
Planform / Channel pattern retention of water in depressions and stream branches, ground water level rise, slower runoff of low waters
Other re-instatement of old course;
Non-structural measures
Management interventions late mowing and mulching on the permanently protected land, mapping of habitat types
Social measures (incl. engagement)
Other popularization of the project, Information provision, education of the youth on the importance of nature conservation


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]]

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]]

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]]

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information