Case study:Guadiamar Green Corridor Project: Difference between revisions
No edit summary |
No edit summary |
||
Line 292: | Line 292: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{ | {{Image gallery}} | ||
{{Case study image | |||
|File name=025 Rio Guadiamar CHGUADALQUIVIR 010.jpg | |||
|Caption=Aerial view | |||
}} | |||
{{Case study image | |||
|File name=025 Rio Guadiamar CHGUADALQUIVIR 010 I.jpg | |||
|Caption=Map of the area affected by the flood | |||
}} | |||
{{Case study image | |||
|File name=025 Rio Guadiamar CHGUADALQUIVIR 010 II.jpg | |||
|Caption=Photo of the Agrio River and Guadiamar floodplain after flood of toxic sludges. | |||
}} | |||
{{Case study image | |||
|File name=025 Rio Guadiamar CHGUADALQUIVIR 010 III.jpg | |||
|Caption=Cleaning and conditioning of slopes | |||
}} | |||
{{Case study image | |||
|File name=025 Rio Guadiamar CHGUADALQUIVIR 010 IV.jpg | |||
|Caption=Mechanical removal of sludges from the riverbed | |||
}} | |||
{{Case study image | |||
|File name=025 Rio Guadiamar CHGUADALQUIVIR 010 V.jpg | |||
|Caption=Aerial view of Guadiamar river floodplain after works | |||
}} | |||
{{Case study image | |||
|File name=025 Rio Guadiamar CHGUADALQUIVIR 010 VI.jpg | |||
|Caption=Guadiamar riverside forest | |||
}} | |||
{{Image_gallery_end}} | {{Image_gallery_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} |
Revision as of 09:45, 22 January 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | MARM |
Main contact surname | MARM |
Main contact user ID | |
Contact organisation | Junta de Andalucía |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
In April 1998 there was a breach in a tailings pond in the Guadiamar River area, causing a spill of 6 million cubic hectometres of sludges with a high concentration of heavy metals (zinc, lead, arsenic, copper, antimony, thallium, cadmium).
The objectives of this project were the Guadiamar River ecological restoration, removal of sludge and effluent pollutants, and creating a green corridor. In addition, we conducted a strategic planning for the different communities of macroinvertebrates, fish, reptiles, birds... The project included several monitoring programs and analysis, in particular, water quality, to see if the level of pollutants had decreased.
This project of restoration and recovery of the area was carried out between 1998 and 2005. The total budget for carry out the rehabilitation and restoration of 62 Km of the Guadiamar River was 165.396.261€. The financing came from the MARM and the Consejería of Environment, Andalucía.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | C.H.Guadalquivir |
---|---|
River basin | Guadalquivir |
Subcatchment
River name | Guadalquivir |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | Less than 100 m |
Maximum altitude (m) | 50 m0.05 km <br />5,000 cm <br /> |
Dominant geology | |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | Extensive agriculture |
Waterbody ID |
Other case studies in this subcatchment: Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros, Recovery "CañoTravieso", Recovery of the functionality of Brazo de la Torre, Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes, Restoration of the stream of the Partido
Site
Name | Caño Guadiamar |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Sinuous |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | Clay, Silt |
River corridor land use | Extensive agriculture |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 12000 m12 km <br />1,200,000 cm <br /> |
---|---|
Project started | 1998/04/01 |
Works started | |
Works completed | 2005/11/01 |
Project completed | |
Total cost category | more than 10000 k€ |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | Junta de Andalucía | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Recovering connectivity longitudinal and transversal |
Floodplain / River corridor | Buffer strips, Recovery of dynamic river system, Facilitate natural regeneration of riparian vegetation |
Planform / Channel pattern | Remove drains and pipes |
Other | Elimination of pollutants due to the discharge of toxic sludge, Recovering natural habitats, Recovering natural landscapes |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Connection to groundwaters | Yes | Yes | Yes | Yes | Awaiting results | |
Structure & condition of riparian zones | Yes | Yes | Yes | Yes | Awaiting results | |
Channel pattern/planform | Yes | Yes | Yes | Awaiting results |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Acid neutralising capacity | Yes | Yes | Yes | Improvement |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Landscape enhancement | Yes | Yes | Yes | Yes | Improvement |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|