Revision as of 11:12, 2 January 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | AEMS |
Main contact surname | AEMS |
Main contact user ID | |
Contact organisation | AEMS - Ríos con Vida |
Contact organisation web site | http://riosconvida.es/ |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Carrión river restoration located in Fresno del Río and Pino del Río (Palencia) covered a river reach with maximum flows between 218 and 527 m3/s, which is regulated by Camporredondo and Compuerto dams. The minimum flow is about 2 m3/s, set by the Confederación Hidrográfica del Duero. The concern about this reach was due to shore erosion and the lack of refuge for trout.
In order to mitigate the impact of flow regulation and to improve the aquatic habitat for fish, several actions took place both instream and at the riparian zone: Boulders (limestone) were placed in the riverbed for improve the instream structure and habitat diversity; reforestation of the margins with four live fences; reforestation with single stakes; plantation of 170 stakes (75 % Salix fragilis and 25% of Salix purpurea and Salix atrocinerea); construction of a wing deflector consisting of stones, logs, and branch cuttings of willow and aquatic plants for its stabilization; plantation of branch cuttings and stakes of willow at stable margins to give shading and shelter for the trouts.
The effectiveness of the project was monitored by the Junta de Castilla y León almost until 1999. The evolution of trout population was measured with periodic samplings (electrofishing).
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | C.H.Duero |
---|---|
River basin | Pisuerga |
Subcatchment
River name | Carrión |
---|---|
Area category | 1000 - 10000 km² |
Area (km2) | |
Maximum altitude category | more than 2000 m |
Maximum altitude (m) | |
Dominant geology | Calcareous |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | Plantation forestry, Extensive agriculture |
Waterbody ID |
Site
Name | Entre Pino del Río y Fresno del Río |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Sinuous |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Quick run-off |
Dominant substrate | |
River corridor land use | Plantation forestry |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 1996/01/01 |
Works started | |
Works completed | 1996/11/01 |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | Confederación Hidrográfica del Duero | ||||
Post-project management and maintenance | |||||
Monitoring | Junta de Castilla y León (Local Government) |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | Structure & condition of riparian zones |
Biology | Fish: Abundance |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | New bioengineering elements in order to stabilize slope banks, Placement of stones on the riverbed, Reshaping of banks, Construction of a deflector consisting of stones, logs, and branch cuttings of willow and aquatic plants for its stabilization |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Structure & condition of riparian zones | Yes | Yes | Yes | Improvement |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish: Abundance | Yes | Yes | Yes | Improvement |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|