Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba): Difference between revisions
No edit summary |
No edit summary |
||
Line 10: | Line 10: | ||
|Location=37.39886906441811, -4.3842315673828125 | |Location=37.39886906441811, -4.3842315673828125 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Country=Spain | |||
|Main contact forename=Antonio | |||
|Main contact surname=Garrido | |||
|Contact organisation=MEDIODÉS | |||
|Contact organisation url=www.mediodes.com/ | |||
|Multi-site=No | |||
|Project summary= This reach of the Anzur River at Aldea de Nacimiento (Rute municipality, Cordoba, Spain) had flooding and incision problems. The riparian vegetation was altered by the presence of exotic species (Arundo donax) or the absence of coverage by native species. Other problem related to the urbanization was the presence of debris and waste at the channel. | |||
|Country= | The project aimed to reduce the floods by increasing the width of the channel and its hydraulic capacity. Along with this intervention, there were other actions, based on bioengineering techniques or materials that allow their environmental integration, with the objective of improve the environmental condition of the reach and the landscape. | ||
|Main contact forename= | |||
|Main contact surname= | |||
|Contact organisation= | |||
|Contact organisation url= | |||
|Multi-site= | |||
|Project | |||
}} | }} | ||
{{Case_study_subcatchment | {{Case_study_subcatchment |
Revision as of 08:54, 27 December 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | Antonio |
Main contact surname | Garrido |
Main contact user ID | |
Contact organisation | MEDIODÉS |
Contact organisation web site | http://www.mediodes.com/ |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This reach of the Anzur River at Aldea de Nacimiento (Rute municipality, Cordoba, Spain) had flooding and incision problems. The riparian vegetation was altered by the presence of exotic species (Arundo donax) or the absence of coverage by native species. Other problem related to the urbanization was the presence of debris and waste at the channel.
The project aimed to reduce the floods by increasing the width of the channel and its hydraulic capacity. Along with this intervention, there were other actions, based on bioengineering techniques or materials that allow their environmental integration, with the objective of improve the environmental condition of the reach and the landscape.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | C.H.Guadalquivir |
---|---|
River basin | Guadalquivir |
Subcatchment
River name | Anzur |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | 500 - 1000 m |
Maximum altitude (m) | |
Dominant geology | Calcareous |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | Extensive agriculture |
Waterbody ID |
Site
Name | Aldea El Nacimiento |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Sinuous |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | Urban |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2008/01/01 |
Works started | |
Works completed | 2008/12/01 |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | MEDIODÉS | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | Channel pattern/planform, Structure & condition of riparian zones |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Bank stabilization, Prevent and reduce bank erosion with live stakes |
Floodplain / River corridor | Silvicultural treatments |
Planform / Channel pattern | Protection and correction of incision problems, Improvement of channel morphology |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|