Case study:Massadammen-dam removal in River Tabergsån: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 29: Line 29:
|Dominant hydrology=Artificially regulated,  
|Dominant hydrology=Artificially regulated,  
}}
}}
{{Project background}}
{{Project background
|Project started=2007
|Works started=2011/08/01
|Works completed=2011/10/31
|Project completed=2011/10/31
|Total cost category=100 - 500 k€
|Total1 cost=174
}}
{{Motivations}}
{{Motivations}}
{{Measures}}
{{Measures}}

Revision as of 10:25, 23 November 2012

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 57° 42' 24.46" N, 14° 6' 59.43" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Fisheries, Habitat and biodiversity, Hydropower, Hydromorphology, Spatial planning
Country Sweden
Main contact forename Peter
Main contact surname Lindvall
Main contact user ID
Contact organisation Länsstyrelsen i Jönköpings län
Contact organisation web site http://projektwebbar.lansstyrelsen.se/vattern/Sv/besoksmal-vatterbackar/tabergsan/Pages/5-massadammen.aspx
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Massadammen dam in the South of Jönköping in the River Tabergsån. The dam was built in 1906 for hydropower but the hydro power station was shut down in 1950´s. Because the dam was an obsticle for migrating fish it was decided to remove to improve the conditions for fish. The aim was to build fishpassage, increase the spawning areas for trout and to reduce the regulation and maintenance of the dam.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment



Site

Edit site
Name Massadammen-Motala Ström
WFD water body codes 067
WFD (national) typology
WFD water body name Tabergsån
Pre-project morphology Embanked, Artificial bed, Artificial channel
Reference morphology
Desired post project morphology
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology Artificially regulated
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started 2007
Works started 2011/08/01
Works completed 2011/10/31
Project completed 2011/10/31
Total cost category 100 - 500 k€
Total cost (k€) 174174 k€ <br />174,000 € <br />
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information