Case study:Beekherstel Beekloop BmN: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 1: Line 1:
{{Case study status
|Approval status=Approved
}}
{{Location
|Location=51.29967830521316, 5.39394961174844
}}
{{Project overview
{{Project overview
|Status=Complete
|Status=Complete
|Themes=Environmental flows and water resources, Flood risk management, Habitat and biodiversity, Hydromorphology, Water quality
|Themes=Environmental flows and water resources, Flood risk management, Habitat and biodiversity, Hydromorphology, Water quality
|Country=Netherlands
|Country=Belgium, Netherlands
|Main contact forename=Ineke
|Main contact forename=Ineke
|Main contact surname=Barten
|Main contact surname=Barten
|Contact organisation=STOWA
|Contact organisation=STOWA
|Contact organisation url=https://www.stowa.nl/contact
|Contact organisation url=https://www.stowa.nl/contact
|Name of parent multi-site project=Bulding with Nature measures in streams
|Name of parent multi-site project=Case_study:Building with Nature
|Multi-site=No
|Multi-site=No
|Project picture=Beekloop.PNG
|Project picture=Beekloop.PNG
Line 23: Line 17:
|Project title=Beekherstel Beekloop BmN
|Project title=Beekherstel Beekloop BmN
}}
}}
{{Case study status
|Approval status=Approved
}}
{{Location
|Location=51.29967830521316, 5.39394961174844
}}
{{Image gallery}}
{{Image gallery}}
{{Image gallery end}}
{{Image gallery end}}

Latest revision as of 12:48, 26 September 2024


Project overview

Edit project overview
Status Complete
Project web site
Themes Environmental flows and water resources, Flood risk management, Habitat and biodiversity, Hydromorphology, Water quality
Country Belgium, Netherlands
Main contact forename Ineke
Main contact surname Barten
Main contact user ID
Contact organisation STOWA
Contact organisation web site http://https://www.stowa.nl/contact
Partner organisations
Parent multi-site project

Case_study:Building with Nature

This is a parent project
encompassing the following
projects
No
Bestaande situatie (rode lijn betreft het projectgebied, met zwart is aangegeven waar werkzaamheden zijn gepland), bron: http://edepot.wur.nl/396172

Project summary

Edit project overview to modify the project summary.


The Beekloop is a mostly man-made stream that originates in the woods between Aalst and Hezen and discharges into the Kleine Dommel near the Hulsterbroek natural area. The stream is located on the edge of the higher Kempens Plateau (Belgium) and a lower area in Noord-Brabant (Netherlands), which results in a relatively large bed slope. The Beekloop was part of several stream restoration projects between 2010 and 2015, some which can be classified as traditional stream restoration and some of which focused on Building with Nature.

One of the main Building with Nature measures that were carried out is the introduction of dead wood in the stream. In addition, specific flora were introduced to improve the flow conditions.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


In additon to the usual measurement of hydrological, biological, and physical-chemical quality elements, chemical measurements were also taken. The stream was strongly polluted prior to the measures. Therefore, concentrations of heavy metals, micropollutants and pesticides were monitored.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 17' 58.84" N, 5° 23' 38.22" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Meuse
River basin Maas

Subcatchment

River name Dommel
Area category 1000 - 10000 km²
Area (km2) 18001,800 km² <br />180,000 ha <br />
Maximum altitude category Less than 100 m
Maximum altitude (m) 7777 m <br />0.077 km <br />7,700 cm <br />
Dominant geology Siliceous
Ecoregion Western Plains
Dominant land cover Grassland, Intensive agriculture (arable), Broadleaf/mixed woodland (semi natural), Moorland/heathland, Urban
Waterbody ID NL_99_6_BO_BE_2



Other case studies in this subcatchment: Beekherstel Keersop, Beekherstel Reusel Baarschot-Diessen, Boven-Dommel, Buulder Aa, Grote Aa, Herinrichting beekdal Tongelreep, Kleine Aa, traject Smalwater Noord, Kleine Beerze


Site

Name Beekloop
WFD water body codes NL27_BO_3_2
WFD (national) typology R4
WFD water body name
Pre-project morphology Sterk veranderd
Reference morphology R4
Desired post project morphology
Heavily modified water body Yes
National/international site designation Netherlands - Natuurbeschermingswet
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology Langzaamstromende Bovenloop
Dominant substrate Sand
River corridor land use Intensive agriculture (arable), Grassland, Broadleaf/mixed woodland (semi natural)
Average bankfull channel width category 5 - 10 m
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m) 0.50.5 m <br />5.0e-4 km <br />50 cm <br />
Mean discharge category
Mean annual discharge (m3/s) 0.30.3 m³/s <br />300 l/s <br />
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2010
Works started
Works completed
Project completed
Total cost category
Total cost (k€) 14.314.3 k€ <br />14,300 € <br />
Benefit to cost ratio
Funding sources 50% provincie, 50% waterschap De Dommel

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project KRW, Ecologie, Waterverdeling


Measures

Structural measures
Bank/bed modifications Dood hout, 6 Vispassages, Beschaduwing
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other Afspraken met belanghebbende over waterverdeling


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information