|Name of parent multi-site project=Buliding with nature measures in streams
|Name of parent multi-site project=Buliding with nature measures in streams
|Multi-site=No
|Multi-site=No
|Project summary=The Beentjesgraven is a small waterway that discharges into the river IJssel. The water authority Drents Overijsselse Delta created more structural variation in this stream to improve their ecological quality and meet WFD criteria. The banks were divided into a green and a blue zone. In the blue zone, vegetation was regularly removed to ensure flow continuity. In the green zone, vegetation is removed less regulaly and in a way that contributes to a varied flow structure.
|Project summary=The Beentjesgraven is a small waterway that discharges into the river IJssel. The water authority Drents Overijsselse Delta created more structural variation in this stream to improve their ecological quality and meet WFD criteria. The banks were divided into a green and a blue zone. In the blue zone, vegetation was regularly removed to ensure flow continuity. In the green zone, vegetation is removed less regularly and in a way that contributes to a varied flow structure.
|Monitoring surveys and results=Vegetation development is monitored by FLORON. Vegetation development is monitored by FLORON. Macroinvertebrates are monitored at 3-4 locations per stream as part of a regional project in the Marswetering, Overijssels Kanaal and Beentjesgraven. The overall ecological quality ratios of the three streams have improved.
|Monitoring surveys and results=Vegetation development is monitored by FLORON. Vegetation development is monitored by FLORON. Macroinvertebrates are monitored at 3-4 locations per stream as part of a regional project in the Marswetering, Overijssels Kanaal and Beentjesgraven. The overall ecological quality ratios of the three streams have improved.
|Project title=Beentjesgraven
|Project title=Beentjesgraven

Latest revision as of 09:52, 20 April 2021

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 35' 45.38" N, 6° 15' 54.24" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Environmental flows and water resources, Habitat and biodiversity, Water quality
Country Netherlands
Main contact forename Sander
Main contact surname Verheijen
Main contact user ID
Contact organisation Waterschap Drents Overijsselse Delta
Contact organisation web site http://www.wdodelta.nl
Partner organisations
Parent multi-site project

Buliding with nature measures in streams

This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The Beentjesgraven is a small waterway that discharges into the river IJssel. The water authority Drents Overijsselse Delta created more structural variation in this stream to improve their ecological quality and meet WFD criteria. The banks were divided into a green and a blue zone. In the blue zone, vegetation was regularly removed to ensure flow continuity. In the green zone, vegetation is removed less regularly and in a way that contributes to a varied flow structure.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


Vegetation development is monitored by FLORON. Vegetation development is monitored by FLORON. Macroinvertebrates are monitored at 3-4 locations per stream as part of a regional project in the Marswetering, Overijssels Kanaal and Beentjesgraven. The overall ecological quality ratios of the three streams have improved.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Rijn
River basin Rijndelta

Subcatchment

River name Vecht
Area category 1000 - 10000 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m)
Dominant geology Siliceous, Organic
Ecoregion Central Plains
Dominant land cover Grassland, Intensive agriculture (arable), Broadleaf/mixed woodland (semi natural)
Waterbody ID NL36_OWM_014



Other case studies in this subcatchment: Beneden Regge, De Doorbraak, Deurningerbeek, Dinkel Noord, Jufferbeek, Living Vechte-Dinkel, Marswetering, Midden Regge, Oude Bornschebeek, Oude Diep... further results


Site

Name Beentjesgraven
WFD water body codes NL04_BEENTJESGRAVEN
WFD (national) typology M1a
WFD water body name Beentjesgraven
Pre-project morphology Artificial channel
Reference morphology Artificial channel
Desired post project morphology Artificial channel
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references