Case study:Tungelroyse beek: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 31: Line 31:
{{Toggle content start}}
{{Toggle content start}}
{{Case study subcatchment
{{Case study subcatchment
|Subcatchment=Meuse
|Subcatchment=Tungelroyse Beek
}}
}}
{{Site
{{Site

Revision as of 14:41, 24 March 2021

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 14' 40.73" N, 5° 50' 33.48" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.wpm.nl/projecten/@179811/leudal/
Themes Environmental flows and water resources, Habitat and biodiversity, Land use management - agriculture
Country Netherlands
Main contact forename Twan
Main contact surname van Dijck
Main contact user ID
Contact organisation Waterschap Limburg
Contact organisation web site http://waterschaplimburg.nl
Partner organisations see description
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Birds eye view of the Tungelroysebeek after completion (source: Waterschap Peels en Maasvallei)

Project summary

Edit project overview to modify the project summary.


For 35 kilometers the Tungelroyse beek flows through the middle of Limburg province, through the municipalities of Weert, Nederweert and Leudal. The stream originates at Budel in the province of North Brabant and discharges near Neerbeek into the Meuse as the Neer stream. For years the stream had been straightened to direct discharges into the Meuse quickly. Over time, with changes land use the water level became unfitting. Moreoverby discharges of substances such as zinc and cadmium had polluted the stream considerably.

In 1999, the Water Board Peel en Maas vallei (Peel and Meuse valley) decided to one of the largest brook restorations projects in the Netherlands, and started the reorganization and restructuring of the Tungelroyse beek. Over course of 12 years and over a length of 30 kilometers work was phased and resulted in bringing back the original meanders, remove contaminated soil, adjust the water level, reduce the number of sewer overflows, improve the quality of life and recreational opportunities, improve conditions for agriculture and contributed to the national ecological network.

Now, the Tungelroyse beek is again a beautiful meandering stream and a habitat for many plants and animals.

A great number of partners was involved in this project: the province of Limburg, the municipalities Leudal, Nederweert, Weert, nature organisations Staatsbosbeheer, NatuurMonumenten, and Stichting LimburgsLandschap. Also the Government Service for Land and Water Management (Dienst Landelijk Gebied), LLTB-Limburg, the IVN, the local anglers association, farmers and private land owners were involved.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Meuse
River basin Maas

Subcatchment

River name Tungelroyse Beek
Area category 100 - 1000 km²
Area (km2) 400400 km² <br />40,000 ha <br />
Maximum altitude category Less than 100 m
Maximum altitude (m)
Dominant geology Sand
Ecoregion Western Plains
Dominant land cover Broadleaf/mixed woodland (semi natural), Intensive agriculture (arable), Grassland
Waterbody ID NL57_TUNG



Other case studies in this subcatchment: Tungelroyse Beek (Downstream), Tungelroyse Beek (upstream)


Site

Name Tungelroyse beek
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use Improved/semi-improved grassland/pasture
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 30 km30,000 m <br />3,000,000 cm <br />
Project started 1999/01/01
Works started
Works completed
Project completed 2011/01/01
Total cost category 10 - 50 k€
Total cost (k€) 3030 k€ <br />30,000 € <br />
Benefit to cost ratio
Funding sources Regeling Actief Bodembeheer de Kempen paid for most of the pollution clean up, RRestoration works was paid for by a number of nature funds: SGB-regeling, ILG-regeling, EU Interreg, Provincie Limburg, Beekmondingenconvenant RWS, Alterra

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Pollution incident, Land drainage, Barriers to fish migration, low ground water table
Hydromorphology Channel pattern/planform
Biology
Physico-chemical Specific non-synthetic pollutants
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Creation of fish passes
Floodplain / River corridor
Planform / Channel pattern Re-meandering
Other Fish by-pass channel, improvement of structure of agricultural land
Non-structural measures
Management interventions
Social measures (incl. engagement) Citizen participation in the restoration project, Conditioning roads, Creation of a working group and an advisory board were established with representatives from local and national authorities and NGOs.
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos



Additional links and references

Link Description
http://vimeo.com/30077201 A video of the Tungelroysebeek by the waterboard

Supplementary Information

Edit Supplementary Information