Case study:Rehabilitation of the river Segeråga: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
{{Case study status}}
{{Case study status}}
{{Location}}
{{Location
|Location=66.71876048455148, 13.2851743630509
}}
{{Project overview}}
{{Project overview}}
{{Image gallery}}
{{Image gallery}}

Revision as of 13:27, 17 February 2021

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 66° 43' 7.54" N, 13° 17' 6.63" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status
Project web site
Themes
Country
Main contact forename
Main contact surname
Main contact user ID
Contact organisation
Contact organisation web site
Partner organisations
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Removing inorganic material (sludge/fine sand. Photo: Kjetil Hansen, Rødøy municipality
After removal of the inorganic material (sludge/fine sand), reinfoorcement of river bank and gravel for spawning grounds. Photo: Kristin B. Klausen, local watercoordinator.
Excavation of sediment ponds in the upper part of the river. Photo: Kjetil Hansen, Rødøy municipality
Sediment pond. Photo: Kjetil Hansen, Rødøy municipality
Excavation of sediment ponds in the middle part of the river. Photo: Kjetil Hansen, Rødøy municipality
Sediment ponds in the middle part of the river after measure. Photo: Kristin B. Klausen, local watercoordinator.
Construction of fishing ladder. Photo: Kjetil Hansen, Rødøy municipality
Fish ladder after measure. Photo: Kristin B. Klausen, local watercoordinator.
Digging of ditches and reinforcement of ditches. Photo: Kjetil Hansen, Rødøy municipality
After digging of ditches and reinforcement of ditches. Photo: Kristin B. Klausen, local watercoordinator.
Gravel for spawning grounds. Photo: Kristin B. Klausen, local watercoordinator.
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Substrate conditions Yes No Yes No No Awaiting results
Width & depth variation Yes No Yes No No Awaiting results

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish: Abundance Yes No No Yes No Awaiting results
Fish: Age structure Yes No No Yes No Awaiting results
Invertebrates: Diversity Yes No No Yes No Awaiting results
Invertebrates: Abundance Yes No No Yes No Awaiting results

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Nutrient concentrations Yes No No Yes No Awaiting results
PH Yes No No Yes No Awaiting results

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://https://brage.nina.no/nina-xmlui/handle/11250/2446580 Plan for rehabilitation of the river
http://https://brage.nina.no/nina-xmlui/handle/11250/2436896 Fish biological survey
http://https://niva.brage.unit.no/niva-xmlui/handle/11250/2478427 Survey of physico-chemical quality elements and biology

Supplementary Information

Edit Supplementary Information