Case study:Oude Leij: Difference between revisions
Jump to navigation
Jump to search
Bas Wullems (talk | contribs) No edit summary |
Bas Wullems (talk | contribs) No edit summary |
||
Line 13: | Line 13: | ||
|Contact organisation=Waterschap Brabantse Delta | |Contact organisation=Waterschap Brabantse Delta | ||
|Contact organisation url=www.brabantsedelta.nl | |Contact organisation url=www.brabantsedelta.nl | ||
|Name of parent multi-site project=Building with | |Name of parent multi-site project=Building with nature measures in streams | ||
|Multi-site=No | |Multi-site=No | ||
|Project summary=In the Oude Leij river, experiments are carried out with different techniques and frequencies of bank vegetation removal. The aim is to find out if a more extensive mowing regime can improve the river's ecological quality. To this end, the banks have been divided into 50 meter long blocks, in which vegetation is not removed for a period of one or two years. A block can be situated on just one side of the river or on both sides. | |Project summary=In the Oude Leij river, experiments are carried out with different techniques and frequencies of bank vegetation removal. The aim is to find out if a more extensive mowing regime can improve the river's ecological quality. To this end, the banks have been divided into 50 meter long blocks, in which vegetation is not removed for a period of one or two years. A block can be situated on just one side of the river or on both sides. |
Revision as of 10:22, 25 November 2020
This case study is pending approval by a RiverWiki administrator.
Location: 51° 30' 47.26" N, 5° 1' 16.08" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Hydromorphology, Monitoring, Water quality |
Country | Netherlands |
Main contact forename | Martin |
Main contact surname | Stamhuis |
Main contact user ID | |
Contact organisation | Waterschap Brabantse Delta |
Contact organisation web site | http://www.brabantsedelta.nl |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
In the Oude Leij river, experiments are carried out with different techniques and frequencies of bank vegetation removal. The aim is to find out if a more extensive mowing regime can improve the river's ecological quality. To this end, the banks have been divided into 50 meter long blocks, in which vegetation is not removed for a period of one or two years. A block can be situated on just one side of the river or on both sides.
Monitoring surveys and results
Edit project overview to modify the Monitoring survey and results.
Due to maintenance problems, the block structure had to be adapted. It will therefore take longer for monitoring results to come in.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|