Case study:LIFE Charcos - Conservação de Charcos Temporários na Costa Sudoeste de Portugal (Conservation of Med Temporary Ponds in SW Portugal): Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 1: Line 1:
{{Case study status
{{Case study status
|Approval status=Draft
|Approval status=Approved
}}
}}
{{Location
{{Location

Latest revision as of 11:23, 25 February 2020

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 37° 21' 19.61" N, 8° 49' 45.52" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://lifecharcos.lpn.pt/en/
Themes Environmental flows and water resources, Habitat and biodiversity, Monitoring
Country Portugal
Main contact forename Rita
Main contact surname Alcazar
Main contact user ID
Contact organisation Liga para a Protecção da Natureza – LPN (Nature Protection League)
Contact organisation web site http://www.lpn.pt
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
LIFE Charcos

Project summary

Edit project overview to modify the project summary.


The Project LIFE CHARCOS aims to promote the conservation of a priority habitat – the Mediterranean Temporary Ponds (MTP) (priority habitat 3170* of the Annex I of EU Habitats Directive) - which is increasingly threatened due to its ecological fragility and by a lack of knowledge regarding its natural value. Moreover, in the last two-decades, land management options, such as modern industrialised agriculture and tourism have caused a steep decline in the condition of this habitat in the N2000 site. This project involves a strong partnership that allies the experience in implementing concrete conservation management measures (LPN), scientific knowledge (UÉvora, UAlg and CCMAR) and local stakeholders dealing with land management (ABM and CMO), which will contribute decisively to the successful implementation of conservation actions. The project consists in a well structured frame of actions that aims to tackle CTM conservation issues posed in the Costa do Sudoeste SCI. Preparatory actions will consolidate scientific knowledge as hidrogeological functioning (A3) and biological survey (A1). Compilation of this information and its integration in a GIS (A2) will support management decisions (actions B and C). The project intends to establish conservation status evaluation criteria (A4) and define CTM management guidelines (A5). The project team will work close with landowners (B1, B2), either for conservation and restoration of ponds (C2, C3), as well as, to promote extensive grazing and habitat connectivity (C1, C6). Seed bank is intended as a repository of native germoplasm (C4) to be used in the restoration actions of the project. Restoration actions will focus on restoring hydrology and hydroperiod, taking into account the basin topography. Removal of exotic and upland scrubby plant species will be done. The restoration of a specific temporary pond will be devoted for public awareness (C5).

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


F.png
E.png
D.png
C.png
B.png
A.png
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Sado and Mira
River basin Sado and Mira

Subcatchment

River name Charcos
Area category
Area (km2)
Maximum altitude category
Maximum altitude (m)
Dominant geology
Ecoregion
Dominant land cover
Waterbody ID



Site

Name Southwest Coast SCI – Portugal (Natural Park of Southwest Alentejo and Vicentina Coast (PNSACV).
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation EU - Special Area of Conservation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2013/07/01
Works started
Works completed
Project completed 2017/12/31
Total cost category 1000 - 5000 k€
Total cost (k€) 1,977.4651,977.465 k€ <br />1,977,465 € <br />
Benefit to cost ratio
Funding sources LIFE PROGRAMME 1, 483.098 Euro (= 75.00% of total eligible budget)

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure protect habitat 3170*
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor conservation and restoration of ponds
Planform / Channel pattern
Other
Non-structural measures
Management interventions CTM management guidelines
Social measures (incl. engagement) conservation and restoration of ponds for public awareness
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information