Case study:Gammelelva: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 57: Line 57:
|Physico-chemical quality elements=eutrophication
|Physico-chemical quality elements=eutrophication
}}
}}
{{Measures}}
{{Measures
|Floodplain / River corridor=Area of open water
}}
{{Hydromorphological quality elements header}}
{{Hydromorphological quality elements header}}
{{End table}}
{{End table}}

Revision as of 09:43, 6 December 2019

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 63° 13' 3.56" N, 10° 18' 24.70" E


Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity
Country Norway
Main contact forename Per Ivar
Main contact surname Bergan
Main contact user ID
Contact organisation Governor of Trøndelag
Contact organisation web site http://www.fylkesmannen.no/Trondelag
Partner organisations Sweco
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


This restoration project is part of a management plan for an ox-bow lake protected as a nature reserve in 1993. The lake is under pressure from new infrastructure and runoff from nearby agricultural land. The main pressure was eutrophication. An overall aim for the project is to restore ain reopen the lake and open water to protect and secure the future survival of rare forest type and animal life. This imply to extend the survival of thi nature type, that naturally is a dynamic habitat and will eventuelly dry out. Due to pressure on natural river systems the establishment of new ox-bow lakes is very limited. Ox-bow lake is a redlisted nature type (Norwegian Redlist). In 2012/2013 large quantities of sediments were excavated, and removed from Gammelelva. This resulted in more open water.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


The status of the lake was monitored before the restoration: Area of open water (from airal photo 1947 - 2011). Status for species (plants, insects, zooplankton, amphibians, fish and birds) has been mapped. There are no spesific plans for further monitoring after restoration.

Lessons learnt

Edit project overview to modify the lessons learnt.


This project gave interesting experience from the practical side, in cooperation with the entrepreneur. The project was highly wanted from management authorities and involved partners. The local people are a bit more biased, due to rewetting and changes in the areas, and fair for less recreation values. The output is partly successful, but the pressure from surrondings in combination with the natural prosesses is challenging, and the status of the oxbow-lake will still be changing. A need for continuous management to mainstain the habitat.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name Gammelelva nature reserve
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present Yes
Invasive species present Yes
Species of interest invasive lupin in near surrondings
Dominant hydrology oxbow-lake
Dominant substrate wetland
River corridor land use infrastructure, Intensive agriculture (arable)
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2011
Works started
Works completed
Project completed
Total cost category
Total cost (k€) 3000030,000 k€ <br />30,000,000 € <br />
Benefit to cost ratio
Funding sources Environmental management authorities

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Sweco Per Ivar Bergan
Stakeholder engagement and communication Local farmers and landowners
Works and works supervision Sweco Per Ivar Bergan
Post-project management and maintenance Governor of Trondelag Jan-Erik Andersen
Monitoring



Reasons for river restoration

Mitigation of a pressure Infrastructure delevopment, agriculture
Hydromorphology road and railway crossing the river
Biology euthropication, invasive species
Physico-chemical eutrophication
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor Area of open water
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information