Case study:TerraSeixe: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 60: Line 60:
}}
}}
{{Motivations}}
{{Motivations}}
{{Measures}}
{{Measures
|Management interventions=definition and implementation of good management practices that ensure the conservation of biodiversity and the restoration of ecosystems in the context of emerging global change
|Social measures=et up a support center for environmental education, ecotourism, research and scientific tourism at international level, contributing to rural development and the promotion of the local economy
|Wider stakeholder / citizen engagement=create a climate refuge as an experimental and demonstrative area of ​​climate change adaptation and mitigation measures
}}
{{Hydromorphological quality elements header}}
{{Hydromorphological quality elements header}}
{{End table}}
{{End table}}

Revision as of 10:57, 25 October 2019

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 37° 29' 5.00" N, 8° 43' 40.40" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.terraseixe.org/localizacao/#/en/introduction/
Themes Economic aspects, Habitat and biodiversity, Land use management - forestry
Country Portugal
Main contact forename Miguel
Main contact surname Jeronimo
Main contact user ID User:GEOTA
Contact organisation GEOTA
Contact organisation web site http://www.geota.pt/scid/geotawebpage/
Partner organisations 11 partners: Câmara Municipal de Aljezur,  Câmara Municipal de Monchique,  Câmara Municipal de Odemira,  Junta de Freguesia de Odeceixe,  Associação Vicentina,  ICNF-DCN Algarve,  APA-ARH Algarve,  Universidade do Algarve – Centro de Estudos em Património, Paisagem e Construção,  Universidade de Évora - Polo de Évora do Centro de Investigação em Biodiversidade e Recursos Genéticos (CIBIO),  Instituto de Ciências Sociais (ICS) - Instituto de Ciências Sociais da Universidade de Lisboa - Grupo de Investigação Ambiente, Território e Sociedade e Universidade Nova de Lisboa - Faculdade de Ciências e Tecnologia
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Tierra Seixe

Project summary

Edit project overview to modify the project summary.


Green infrastructures (GI) are fundamental for territorial development. The Seixe river catchment basin (BHRS) is a microclimatic refuge with biogeographic characteristics , in particular fauna and flora with protection status. The aim of the project is to define GI and good management practices that are fundamental for ecological restoration and connectivity, biodiversity conservation and the promotion of nature tourism, based on climate change adaptation. In 2004, the Cordão Verde project in the south of Portugal defined the main ecological corridors that would ensure the ecological connectivity between the Alentejo coast and the Guadiana river valley, identifying the Monchique mountain and BHRS as the main hotspot in southern Portugal for biodiversity conservation. The combination of geographical and orographic characteristics created conditions for the existence of a microclimate refuge where some species typical of landscapes common at the end of the Tertiary period still persist, although today they are almost nonexistent in mainland Portugal. One of the representative species of these landscapes is the Quercus canariensis (Monchique oak). This species, together with other endemic flora and fauna of the region, gives a unique value to the native forests of this basin. This is formally recognized by the integration of almost 90% of this territory into the Natura 2000 Network, Important Bird Area (IBA) and the National Network of Protected Areas. The project is being developed as a transdisciplinary pilot project in the area of biodiversity conservation, land use and climate change. In particular, it focueses the protection and conservation of species of restricted distribution, such as endemic species, and the need to organize and manage this territory to make it more resilient to climate change, in which southern Portugal is particularly vulnerable. The overall objectives are: (i) definition and implementation of good management practices that ensure the conservation of biodiversity and the restoration of ecosystems in the context of emerging global change; (ii) create a climate refuge as an experimental and demonstrative area of climate change adaptation and mitigation measures; (iii) set up a support center for environmental education, ecotourism, research and scientific tourism at international level, contributing to rural development and the promotion of the local economy.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Location of the Seixe river catchment basin and biodiversity indicators
Seixe river
Seixe river
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district seixe
River basin Seixe river

Subcatchment

River name seixe
Area category
Area (km2)
Maximum altitude category
Maximum altitude (m)
Dominant geology
Ecoregion
Dominant land cover
Waterbody ID



Site

Name Seixe river
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations Important Bird Area and National Network of Protected Areas
Protected species present Yes
Invasive species present No
Species of interest Quercus canariensis (Monchique oak)
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2017/12/04
Works started
Works completed
Project completed 2019/02/28
Total cost category
Total cost (k€) 7500075,000 k€ <br />75,000,000 € <br />
Benefit to cost ratio
Funding sources ERDF (70%); Municipalities (30%)

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions definition and implementation of good management practices that ensure the conservation of biodiversity and the restoration of ecosystems in the context of emerging global change
Social measures (incl. engagement) et up a support center for environmental education, ecotourism, research and scientific tourism at international level, contributing to rural development and the promotion of the local economy
Other create a climate refuge as an experimental and demonstrative area of climate change adaptation and mitigation measures


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information