Case study:Herinrichting Beekloop: Difference between revisions
No edit summary |
No edit summary |
||
Line 110: | Line 110: | ||
{{End table}} | {{End table}} | ||
{{Physico-chemical quality elements header}} | {{Physico-chemical quality elements header}} | ||
{{Physico-chemical quality element table row | |||
|Element=Temperature | |||
|Monitored before=Yes | |||
|Monitored after=Yes | |||
|Qualitative monitoring=Yes | |||
|Quantitative monitoring=Yes | |||
|Control site used=No | |||
}} | |||
{{Physico-chemical quality element table row | |||
|Element=Specific synthetic pollutants | |||
|Monitored before=Yes | |||
|Monitored after=Yes | |||
|Qualitative monitoring=Yes | |||
|Quantitative monitoring=Yes | |||
|Control site used=No | |||
|Result=Improvement | |||
}} | |||
{{Physico-chemical quality element table row | |||
|Element=Salinity | |||
|Monitored before=Yes | |||
|Monitored after=Yes | |||
|Qualitative monitoring=Yes | |||
|Quantitative monitoring=Yes | |||
|Control site used=No | |||
}} | |||
{{Physico-chemical quality element table row | |||
|Element=Transparency | |||
|Monitored before=Yes | |||
|Monitored after=Yes | |||
|Qualitative monitoring=Yes | |||
|Quantitative monitoring=Yes | |||
|Control site used=No | |||
|Result=Improvement | |||
}} | |||
{{Physico-chemical quality element table row | |||
|Element=PH | |||
|Monitored before=Yes | |||
|Monitored after=Yes | |||
|Qualitative monitoring=Yes | |||
|Quantitative monitoring=Yes | |||
|Control site used=No | |||
}} | |||
{{Physico-chemical quality element table row | |||
|Element=Oxygen balance | |||
|Monitored before=Yes | |||
|Monitored after=Yes | |||
|Qualitative monitoring=Yes | |||
|Quantitative monitoring=Yes | |||
|Control site used=No | |||
|Result=No change | |||
}} | |||
{{Physico-chemical quality element table row | |||
|Element=Nutrient concentrations | |||
|Monitored before=Yes | |||
|Monitored after=Yes | |||
|Qualitative monitoring=Yes | |||
|Quantitative monitoring=Yes | |||
|Control site used=No | |||
|Result=Improvement | |||
}} | |||
{{End table}} | {{End table}} | ||
{{Other responses header}} | {{Other responses header}} |
Revision as of 11:29, 7 September 2019
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Fisheries, Hydromorphology, Land use management - agriculture |
Country | Netherlands |
Main contact forename | Ineke |
Main contact surname | Barten |
Main contact user ID | User:MaritJob |
Contact organisation | STOWA |
Contact organisation web site | http://www.stowa.nl/contact |
Partner organisations | Waterschap De Dommel |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
De Beekloop is voor het grootste deel gegraven door de mens en ontspringt in de bossen tussen Aalst en Hezen en uitkomt in de Kleine Dommel ter hoogte van natuurgebied Hulsterbroek. De waterloop ligt bij de overgang van het Kempisch plateau in België tot een lager gelegen gebied in Noord-Brabant, wat resulteert in een relatief groot bodemverhang. De beekloop is betrokken geweest bij vele beekherstel projecten tussen 2010 en 2015, waarbij sommige projecten geclassificeerd kunnen worden als traditioneel beekherstel (TB) en sommige projecten met de focus op Bouwen met Natuur (BmN). Voor trajecten (152 t/m 159) zijn zowel BmN werkzaamheden uitgevoerd als traditioneel beekherstel (Factsheet NL27_BO_3_2). De belangrijkste BmN maatregel die hier is toegepast is het toevoegen van dood hout. Dit is gedaan over een totale lengte van 750 meter ter hoogte van stuw 't Schut. Daarnaast zijn er ook 6 vispassages aangelegd en is er beschaduwing toegepast.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Supplementary funding informationDe totale kosten van het project bestaan uit een deel traditioneel beekherstel en een deel bouwen met natuur. Gecombineerd zijn de kosten respectievelijk ongeveer €14.000 + €28.000 = €42.000.
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|