Case study:Welton Farm Landfill/Riverbank Works: Difference between revisions
Crchalmers (talk | contribs) No edit summary |
Crchalmers (talk | contribs) No edit summary |
||
Line 23: | Line 23: | ||
|File name=Landfill.jpg | |File name=Landfill.jpg | ||
|Caption=Historic Landfill | |Caption=Historic Landfill | ||
}} | |||
{{Case study image | |||
|File name=Root Wad.jpg | |||
|Caption=Root Wad Installation | |||
}} | |||
{{Case study image | |||
|File name=Completion.jpg | |||
|Caption=Project Completion | |||
}} | |||
{{Case study image | |||
|File name=Drone.png | |||
|Caption=Drone Image Following Works | |||
}} | }} | ||
{{Image gallery end}} | {{Image gallery end}} |
Revision as of 12:14, 20 March 2019
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Flood risk management, Habitat and biodiversity |
Country | Scotland |
Main contact forename | Chris |
Main contact surname | Chalmers |
Main contact user ID | |
Contact organisation | PKC |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The River Ericht is part of the wider Tay catchment and has a steep, flashy catchment with an area of 432km2 to its confluence with the River Tay. The project was located 2km downstream of Blairgowrie, Scotland and located within a Special Area of Conservation (SAC), UK0030312. The project was undertaken on a historic landfill site on the south riverbank of the River Ericht. There is considerable ecological variety in the Tay catchment, resulting in the Tay supporting the full range of salmon life-history types found in Scotland, with adult salmon entering the River Tay throughout the year to spawn in different parts of the catchment. In addition, Otter, Beaver, Bird and three Lamprey species (Sea, Brook and River) were found within the SAC.
The project consisted of landfill and riverbank remediation work. Landfill material was polluting the River Ericht impacting the watercourse and subsequent SAC following numerous spate events in 2015/16. This had a direct impact upon the ecology and environment. The aim of the project was to prevent further landfill material entering the watercourse and to install protective measures to protect the riverbank and reduce further erosion.
Monitoring surveys and results
The project has only recently been completed and the full benefits have yet to be quantified. The willow and grass seed has started to grow following a mild autumn in 2018 and the integrity of the riverbank has been tested following a number of spate events in December 2018 and February/March 2019. A monitoring regime has been set up in order to assess the longer term performance of the scheme.
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|