Case study:RESTORATION OF THE TRESENEC STREAM: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Draft
   
 
 
   
      Draft
}}
{{Location
|Location=
   
   
     
}}
}}
{{Location}}
{{Project overview
{{Project overview
|Status=Complete
|Status=Complete
Line 47: Line 37:
the external assistance where needed and funded by Notranjska regional Park
the external assistance where needed and funded by Notranjska regional Park
}}
}}
{{Image_gallery}}
{{Image gallery}}
{{Image_gallery_end}}
{{Image gallery end}}
{{Toggle button}}
{{Toggle button}}
{{Toggle content start}}
{{Toggle content start}}
{{Case_study_subcatchment
{{Case study subcatchment
|Subcatchment=
|Subcatchment=Tresenec
   
   
      Tresenec
}}
}}
{{Site
{{Site
|Name=
|Name=watercourses Tresenec
   
|WFD (national) typology=SI141VT2 VTJ Cerkniško jezero (Cerknica lake)
   
|Reference morphology=Higher groundwater level
      watercourses Tresenec
|Local site designation=Ramsar
|WFD water body code=
|Site designation=EU - Special Area of Conservation
     
|Dominant hydrology=Ephemeral
|WFD (national) typology=
|Dominant substrate=Silt,Sand,Gravel
      SI141VT2 VTJ Cerkniško jezero (Cerknica lake)
|River corridor land use=Wetland,Extensive agriculture
|WFD water body name=
|Average bankfull channel width category=2 - 5 m
     
|Average bankfull channel depth category=0.5 - 2 m
|Pre-project morphology=
     
|Reference morphology=
      Higher groundwater level
|Heavily modified water body=
     
|Local site designation=
      Ramsar
|Site designation=
      EU - Special Area of Conservation
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
      Ephemeral
|Dominant substrate=
      Silt,Sand,Gravel
|River corridor land use=
      Wetland,Extensive agriculture
|Average bankfull channel width category=
      2 - 5 m
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
      0.5 - 2 m
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
     
}}
}}
{{Project_background
{{Project background
|Reach length directly affected=
|Project started=2007/01/01
   
|Works completed=2009/12/01
   
|Funding sources=Notranjska Regional Park,Municipality of Cerknica,Ministry of Environment and Spatial Planning
     
|Investigation and design Lead organisation=Notranjska Regional Park
|Project started=
|Works and supervision Lead organisation=Gradbinko d.o.o.
      2007/01/01
|Works started=
     
|Works completed=
      2009/12/01
|Project completed=
     
|Total cost category=
     
|Total1 cost=
     
|Funding sources=
      Notranjska Regional Park,Municipality of Cerknica,Ministry of Environment and Spatial Planning
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
      Notranjska Regional Park
|Investigation and design Other contact forename=
     
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
     
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
      Gradbinko d.o.o.
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations
Line 185: Line 69:
|Bank and bed modifications measure=Local deepening, Construction of the overflows between individual meanders
|Bank and bed modifications measure=Local deepening, Construction of the overflows between individual meanders
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological quality elements header}}
{{End_table}}
{{End table}}
{{Biological_quality_elements_header}}
{{Biological quality elements header}}
{{End_table}}
{{End table}}
{{Physico-chemical_quality_elements_header}}
{{Physico-chemical quality elements header}}
{{End_table}}
{{End table}}
{{Other_responses_header}}
{{Other responses header}}
{{End_table}}
{{End table}}
{{Monitoring_documents}}
{{Monitoring documents}}
{{Monitoring_documents_end}}
{{Monitoring documents end}}
{{Additional_Documents}}
{{Additional Documents}}
{{Additional_Documents_end}}
{{Additional Documents end}}
{{Additional_links_and_references_header}}
{{Additional links and references header}}
{{Additional_links_and_references_footer}}
{{Additional links and references
{{Supplementary_Information
|Link=ec.europa.eu/environment/life/project/Projects/index.cfm?fuseaction=home.showFile&rep=file&fil=LIFE06_NAT_SI_000069_AfterLIFE.pdf
|Information=
|Description=Some information on this page has been copied from this web page.
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
     
}}
}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Toggle content end}}
{{Case_study_upload}}
{{Case_study_upload}}
{{Toggle content end}}

Revision as of 10:30, 30 July 2018

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: none specified



Project overview

Edit project overview
Status Complete
Project web site
Themes
Country Slovenia
Main contact forename Tanja
Main contact surname Vasilevska
Main contact user ID
Contact organisation Notranjski regijski park
Contact organisation web site
Partner organisations
Parent multi-site project

Case_study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica

This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Renaturation of former riverbeds was carried out at specific sections of the Goriški Brežiček and Tresenec streams. Both brooks were rerouted to their former meanders in the length of more than 500 m each.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


Floristic inventory and monitoring of the plant species composition of the habitat types in the areas of restored riverbeds as a tool in assessing the changes caused by rerouting the Goriški Brežiček and Tresenec streams. The action will be carried out by the park staff and funded by Notranjska regional Park.

Floristic inventory and monitoring of the plant species composition of the habitat

types in the areas of restored riverbeds of Goriški Brežiček and Tresenec streams in order to notice possible establishing of invasive plant species, for example Himalayan Balsam (Impatiens glandulifera), Canada (Solidago canadensis) and Giant Goldenrod (Solidago gigantea), Cutleaf Coneflower (Rudbeckia laciniata), Topinambur (Helianthus tuberosus) and allochthonous species of the genus knotweed (Fallopia). Establishing is possible because construction machinery used for restoration is known to be disperser of these species and because of the suitable habitat. These plants will be manually removed, should they show up. The action will be carried out by the park staff and funded by Notranjska regional Park.

Suitable management of banks to ensure habitat diversity and accessibility; water weed management to prevent the clogging of the watercourse; dredging of the riverbeds as a rejuvenating process; bank protection to prevent erosion where needed in the areas of restored riverbeds of Goriški Brežiček and Tresenec streams will be implemented. The action will be carried out by the park staff with the external assistance where needed and funded by Notranjska regional Park

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Danube
River basin Sava River

Subcatchment

River name Tresenec
Area category
Area (km2)
Maximum altitude category 500 - 1000 m
Maximum altitude (m)
Dominant geology Organic (i.e. Peat), Calcareous
Ecoregion Dinaric Western Balkan
Dominant land cover Wetland, Extensive agriculture, Woodland
Waterbody ID



Site

Name watercourses Tresenec
WFD water body codes
WFD (national) typology SI141VT2 VTJ Cerkniško jezero (Cerknica lake)
WFD water body name
Pre-project morphology
Reference morphology Higher groundwater level
Desired post project morphology
Heavily modified water body
National/international site designation EU - Special Area of Conservation
Local/regional site designations Ramsar
Protected species present
Invasive species present
Species of interest
Dominant hydrology Ephemeral
Dominant substrate Silt, Sand, Gravel
River corridor land use Wetland, Extensive agriculture
Average bankfull channel width category 2 - 5 m
Average bankfull channel width (m)
Average bankfull channel depth category 0.5 - 2 m
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2007/01/01
Works started
Works completed 2009/12/01
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources Notranjska Regional Park, Municipality of Cerknica, Ministry of Environment and Spatial Planning

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Notranjska Regional Park
Stakeholder engagement and communication
Works and works supervision Gradbinko d.o.o.
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Width & depth variation, Continuity of sediment transport
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Local deepening, Construction of the overflows between individual meanders
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://ec.europa.eu/environment/life/project/Projects/index.cfm?fuseaction=home.showFile&rep=file&fil=LIFE06 NAT SI 000069 AfterLIFE.pdf Some information on this page has been copied from this web page.

Supplementary Information

Edit Supplementary Information