Case study:Renaturierung Untere Havel: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 192: Line 192:
|Floodplain / River corridor=Floodplain reconnection,
|Floodplain / River corridor=Floodplain reconnection,
|Planform / Channel pattern=Channel narrowing
|Planform / Channel pattern=Channel narrowing
|Other technical measure=create more natural flow regime,Install fish passes,Re-connect backwater and wetlands,weir removal
|Other technical measure=Create more natural flow regime,Re-connect backwater and wetlands, Weir removal, Creation of fish passes,
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}

Revision as of 09:08, 2 June 2017

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 45' 16.68" N, 12° 13' 0.47" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Spatial planning, Habitat and biodiversity, Hydromorphology
Country Germany
Main contact forename
Main contact surname
Main contact user ID
Contact organisation (FORECASTER)
Contact organisation web site
Partner organisations
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district
River basin

Subcatchment

River name Havel
Area category more than 10000 km²
Area (km2)
Maximum altitude category
Maximum altitude (m)
Dominant geology Siliceous
Ecoregion
Dominant land cover
Waterbody ID



Site

Name Untere Havel
WFD water body codes
WFD (national) typology Type 20: very large sand-dominated river
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2005/01/01
Works started
Works completed 2018/01/01
Project completed
Total cost category more than 10000 k€
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design NABU Naturschutzbund Deutschland Rocco Buchta (Rocco.Buchta@NABU.de )
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Riparian development, Reservoir impoundment
Hydromorphology Continuity for organisms, Structure & condition of riparian zones, Quantity & dynamics of flow, Flow velocities, Continuity of sediment transport, Channel pattern/planform
Biology Fish: Abundance
Physico-chemical
Other reasons for the project Landscape enhancement


Measures

Structural measures
Bank/bed modifications Bed raising, Removal of revetments
Floodplain / River corridor Floodplain reconnection
Planform / Channel pattern Channel narrowing
Other Create more natural flow regime, Re-connect backwater and wetlands, Weir removal, Creation of fish passes
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information