Line 26: | Line 26: | ||
|Specific mitigation=Invasive species, | |Specific mitigation=Invasive species, | ||
}} | }} | ||
{{Measures}} | {{Measures | ||
|Bank and bed modifications measure=Removal of invasive species, | |||
|Social measures=Citizen participation in the restoration project, Improved public access, | |||
|Wider stakeholder / citizen engagement=community engagement, | |||
}} | |||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
{{End table}} | {{End table}} |
Revision as of 12:35, 30 September 2012
This case study is pending approval by a RiverWiki administrator.
Location: 55° 51' 12.36" N, 3° 9' 43.62" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Planned |
---|---|
Project web site | http://http://www.facebook.com/friendsofroslinglen |
Themes | Habitat and biodiversity, Monitoring, Social benefits |
Country | Scotland |
Main contact forename | John |
Main contact surname | Sharp |
Main contact user ID | User:Sharpjv |
Contact organisation | Friends of Roslin Glen |
Contact organisation web site | http://www.facebook.com/friendsofroslinglen |
Partner organisations | Esk Valley Trust |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Scotland RBD |
---|---|
River basin | Forth |
Subcatchment
River name | North Esk |
---|---|
Area category | 100 - 1000 km² |
Area (km2) | |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | |
Dominant geology | Siliceous |
Ecoregion | Great Britain |
Dominant land cover | Broadleaf/mixed woodland (semi natural) |
Waterbody ID |
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | Invasive species |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Removal of invasive species |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | Citizen participation in the restoration project, Improved public access |
Other | community engagement |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents