Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 15: Line 15:
|Contact organisation=freiland Environmental Consulting Civil Engineers Ltd.
|Contact organisation=freiland Environmental Consulting Civil Engineers Ltd.
|Contact organisation url=www.freiland.at
|Contact organisation url=www.freiland.at
|Partner organisations=Office of the Styrian Government - Department 14 Watermanagement, resources and sustainability
|Multi-site=No
|Multi-site=No
|Project summary=Under the heading of "murerleben" already the second LIFE - project on the river Upper Mur runs in Austria. After completion of murerleben I, murerleben II started, considering the monitoring results and lessons learned:
|Project summary=Under the heading of "murerleben" already the second LIFE - project on the river Upper Mur runs in Austria. After completion of murerleben I, murerleben II started, considering the monitoring results and lessons learned:

Revision as of 13:13, 2 July 2015

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 47° 6' 46.94" N, 14° 10' 8.54" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site http://www.murerleben.at/index.asp?pg_nr=60460&lang=en
Themes Environmental flows and water resources, Flood risk management, Habitat and biodiversity, Hydromorphology, Monitoring
Country Austria
Main contact forename Jörg
Main contact surname Raderbauer
Main contact user ID User:9984
Contact organisation freiland Environmental Consulting Civil Engineers Ltd.
Contact organisation web site http://www.freiland.at
Partner organisations Office of the Styrian Government - Department 14 Watermanagement, resources and sustainability
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Under the heading of "murerleben" already the second LIFE - project on the river Upper Mur runs in Austria. After completion of murerleben I, murerleben II started, considering the monitoring results and lessons learned:

• to enhance and support the previously implemented stepping stones focussing on their up- and downstream impacts.

• to create large connected and diversified habitats in the river and its alluvial forest areas

• to support the consolidation of the revitalized sections

• to enable those species which need various, local separate habitat structures, such as amphibians and kinds of fish to benefit from these contiguous habitat complexes (wintering, spawning, summer quarters)

The new LIFE+ areas were selected consciously in due consideration of previous projects in order to strengthen the already taken measures and to create a related restructuring stretch of river. The measures, but also the synergy effects of the measures, are scientifically examined in a monitoring programme aiming at documenting and maintaining the success of the projects. The programme is going to continue until 2015.

In the present second LIFE+ project from 2010 to 2015 investments of about EUR 2.8 Mio. are planned, 50% thereof is financed by the EU. 7 new measures are projected in connection with “murerleben I”

• Revitalisation or recreation of 7 distributaries and widenings

• Initiation of 17,7 ha new areas with alluvial forest

• Implementation of ponds serving as habitats for amphibians (13,000 m²)

• Reactivation of approximately 10 ha flooding area

In accordance with the objectives of the Natural Habitats Directive and the requirements of the EU Water Framework Directive in the two LIFE-Projects 16 water segments of the river Mur (a total length of 90 km) are planned. The implementation regards the preservation of the biodiversity, the dynamic river development as well as the improvement of the passive flood protection.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 and LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 ©freiland
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information